HTS Heading 9103
Clocks with watch movements, excluding clocks of heading 9104
All 4 HTS codes under heading 9103 (clocks with watch movements, excluding clocks of heading 9104), with their duty rates from the 2026 HTS Revision 23.
Every line of heading 9103
- 9103 Clocks with watch movements, excluding clocks of heading 9104.
- 9103.10 Electrically operated (under: Clocks with watch movements, excluding clocks of heading 9104).
- 9103.10.20 With opto-electronic display only: General 2.6% on the movement and case + 3.6% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
- 9103.10.40 Having no jewels or only one jewel in the movement: General 24¢ each + 4.5% on the case + 3.5% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.50 each + 45% on the case + 35% on the battery.
- 9103.10.80 Other (under: Other): General 48¢ each + 4.6% on the case + 3.5% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $2.50 each + 45% on the case + 35% on the battery.
- 9103.90.00 Other (under: Clocks with watch movements, excluding clocks of heading 9104): General 24¢ each + 4.6% on the case; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.50 each + 45% on the case.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.