HTS Heading 9104
Instrument panel clocks and clocks of a similar type for vehicles, aircraft, spacecraft or vessels
All 9 HTS codes under heading 9104 (instrument panel clocks), with their duty rates from the 2026 HTS Revision 23. General duty 4.3% to 6.4%, some per unit.
Every line of heading 9104
- 9104.00 Instrument panel clocks and clocks of a similar type for vehicles, aircraft, spacecraft or vessels.
- 9104.00.05 With opto-electronic display only: General 2.6% on the movement and case + 3.5% on the battery; Special Free (A+,AU,B,BH, C,CL,CO,D,E, IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 35%.
- 9104.00.10 Electric (including battery operated): General 20¢ each + 4.3% on the movement and case + 3.5% on the battery; Special Free (A+,AU,B,BH, C,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 $3 each + 65% on the movement and case + 35% on the battery.
- 9104.00.20.00 Other (under: Other) (No.): General 30¢ each + 6.4%; Special Free (A+,AU,B,BH, C,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 $3 each + 65%.
- 9104.00.25 With opto-electronic display only: General 3.9% on the movement and case + 5.3% on the battery; Special Free (A+,AU,B,BH, C,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 35%.
- 9104.00.30 Electric (including battery operated): General 30¢ each + 4.3% on the movement and case + 3.5% on the battery; Special Free (A+,AU,B,BH, C,CL,CO,D, E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 $4.50 each + 65% on the movement and case + 35% on the battery.
- 9104.00.40.00 Other (under: Other) (No.): General 30¢ each + 4.3%; Special Free (A+,AU,B,BH, C,CL,CO,D, E,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 $4.50 each + 65%.
- 9104.00.45 With opto-electronic display only: General 2.6% on the movement and case + 3.5% on the battery; Special Free (A+,AU,B,BH, C,CL,CO,D, E,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 35%.
- 9104.00.50 Electric (including battery operated): General 20¢ each + 4.6% on the case + 3.5% on the battery; Special Free (A+,AU,B,BH, C,CL,CO,D, E,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 75¢ each + 45% on the case + 35% on the battery.
- 9104.00.60 Other (under: Other): General 19¢ each + 4.5% on the case; Special Free (A+,AU,B,BH, C,CL,CO,D, E,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 75¢ each + 45% on the case.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.