HTS Heading 9105

Other clocks

All 22 HTS codes under heading 9105 (other clocks), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.4%, some per unit.

Every line of heading 9105

  • 9105 Other clocks.
  • 9105.11 Electrically operated (under: Alarm clocks).
  • 9105.11.40 With opto-electronic display only: General 3.9% on the movement and case + 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 9105.11.80 Other (under: Electrically operated): General 30¢ each + 6.9% on the case + 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75¢ each + 45% on the case + 35% on the battery.
  • 9105.19 Other (under: Alarm clocks).
  • 9105.19.10 Not constructed or designed to operate for over 47 hours without rewinding: General 30¢ each + 6.9% on the case; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 75¢ each + 45% on the case.
  • 9105.19.20 Having no jewels or only one jewel: General 60¢ each + 6.9% on the case; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 $1.75 each + 45% on the case.
  • 9105.19.30 Having over one jewel (under: Constructed or designed to operate for over 47 hours without rewinding): General 43¢ each + 2.8¢/jewel over 7 + 3.7% on the case; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 $2.25 each + 15¢/jewel over 7 + 60% on the case.
  • 9105.19.40.00 Valued not over $5 each (under: Other) (No.): General 15¢ each + 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.50 each + 65%.
  • 9105.19.50.00 Valued over $5 each (under: Other) (No.): General 23¢ each + 3.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
  • 9105.21 Electrically operated (under: Wall clocks).
  • 9105.21.40 With opto-electronic display only: General 3.9% on the movement and case+ 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 9105.21.80 Other (under: Electrically operated): General 30¢ each + 6.9% on the case + 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 75¢ each + 45% on the case + 35% on the battery.
  • 9105.29 Other (under: Wall clocks).
  • 9105.29.10 Not constructed or designed to operate for over 47 hours without rewinding: General 20¢ each + 4.6% on the case; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 75¢ each + 45% on the case.
  • 9105.29.20 Having no jewels or only one jewel: General 40¢ each + 4.6% on the case; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.75 each + 45% on the case.
  • 9105.29.30 Having over one jewel (under: Constructed or designed to operate for over 47 hours without rewinding): General 57¢ each + 3.7¢/jewel over 7 + 4.9% on the case; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $2.25 each + 15¢/jewel over 7 + 60% on the case.
  • 9105.29.40.00 Valued not over $5 each (under: Other) (No.): General 15¢ each + 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.50 each + 65%.
  • 9105.29.50.00 Valued over $5 each (under: Other) (No.): General 30¢ each + 4.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
  • 9105.91 Electrically operated (under: Other).
  • 9105.91.40 With opto-electronic display only: General 3.9% on the movement and case+ 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 9105.91.80 Other (under: Electrically operated): General 30¢ each + 6.9% on the case + 5.3% on the battery; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 75¢ each + 45% on the case + 35% on the battery.
  • 9105.99 Other (under: Other).
  • 9105.99.10.00 Standard marine chronometers having spring-detent escapements (No., Jwls.): General 17¢ each + 2.5% + 1¢/jewel; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% + 25¢/jewel.
  • 9105.99.20 Not constructed or designed to operate for over 47 hours without rewinding: General Free; Special none; Column 2 75¢ each + 45% on the case.
  • 9105.99.30 Having no jewels or only one jewel: General Free; Special none; Column 2 $1.75 each + 45% on the case.
  • 9105.99.40 Having over one jewel (under: Constructed or designed to operate for over 47 hours without rewinding): General Free; Special none; Column 2 $2.25 each + 15¢/jewel over 7 + 60% on the case.
  • 9105.99.50.00 Valued not over $5 each (under: Other) (No.): General 7.5¢ each + 3.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $1.50 each + 65%.
  • 9105.99.60.00 Valued over $5 each (under: Other) (No.): General 23¢ each + 3.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.