HTS Heading 9106

Time of day recording apparatus and apparatus for measuring, recording or otherwise indicating intervals of time, with clock or watch movement or with synchronous motor (for example, time registers, time-recorders)

All 7 HTS codes under heading 9106 (time of day recording apparatus), with their duty rates from the 2026 HTS Revision 23. General duty 3.9%.

Every line of heading 9106

  • 9106 Time of day recording apparatus and apparatus for measuring, recording or otherwise indicating intervals of time, with clock or watch movement or with synchronous motor (for example, time registers, time-recorders).
  • 9106.10.00.00 Time registers; time-recorders (No., Jwls.): General 36¢ each + 5.6% + 2¢/jewel; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% + 25¢/jewel.
  • 9106.90 Other (under: Time of day recording apparatus and apparatus for measuring, recording or otherwise indicating intervals of time, with clock or watch movement or with synchronous motor (for example, time registers, time-recorders)).
  • 9106.90.20.00 Parking meters (under: Other) (No., Jwls.): General 36¢ each + 5.6% + 2¢/jewel; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% + 25¢/jewel.
  • 9106.90.40.00 Time locks valued over $10 each (No., Jwls.): General 36¢ each + 5.6% + 2¢/jewel; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% + 25¢/jewel.
  • 9106.90.55 With opto-electronic display only: General 3.9% on the apparatus + 5.3% on the battery; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
  • 9106.90.65.00 Other (under: Apparatus for measuring, recording, or otherwise indicating intervals of time, with clock or watch movements, battery powered) (No., Jwls.): General 15¢ each + 2.3% + 0.8¢/jewel; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% + 25¢/jewel.
  • 9106.90.75.00 Apparatus for measuring, recording or otherwise indicating intervals of time, with clock or watch movements, AC powered and with opto-electronic display only (No.): General 3.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65%.
  • 9106.90.85.00 Other (under: Other) (No., Jwls.): General 15¢ each + 2.3% + 0.8¢/jewel; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% + 25¢/jewel.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.