HTS Heading 9107
Time switches with clock or watch movement or with synchronous motor
All 3 HTS codes under heading 9107 (time switches with clock or watch movement or with synchronous motor), with their duty rates from the 2026 HTS Revision 23.
Every line of heading 9107
- 9107.00 Time switches with clock or watch movement or with synchronous motor.
- 9107.00.40 Valued not over $5 each (under: Time switches with clock or watch movement or with synchronous motor): General 15¢ each + 4% + 2.5¢/jewel; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $1.50 each + 65% + 25¢/jewel.
- 9107.00.40.40 Time switches that operate on a fixed-time cycle, of a type used in household type refrigerators and combined refrigerator-freezers, to alternately control the operations of the compressor and the defrost unit (defrost timers) (No., Jwls.).
- 9107.00.40.80 Other (under: Valued not over $5 each) (No., Jwls.).
- 9107.00.80.00 Valued over $5 each (under: Time switches with clock or watch movement or with synchronous motor) (No., Jwls.): General 45¢ each + 6.4% + 2.5¢/jewel; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $4.50 each + 65% + 25¢/jewel.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.