HTS Heading 9113
Watch straps, watch bands and watch bracelets, and parts thereof
All 7 HTS codes under heading 9113 (watch straps), with their duty rates from the 2026 HTS Revision 23. General duty 1.8% to 11.2%.
Every line of heading 9113
- 9113 Watch straps, watch bands and watch bracelets, and parts thereof.
- 9113.10.00.00 Of precious metal or of metal clad with precious metal (doz.): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 80%.
- 9113.20 Of base metal, whether or not gold- or silver-plated.
- 9113.20.20.00 Valued not over $5 per dozen (under: Straps, bands and bracelets) (doz.): General 11.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 110%.
- 9113.20.40.00 Valued over $5 per dozen (under: Straps, bands and bracelets) (doz.): General 11.2%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 110%.
- 9113.20.60.00 Of watch bracelets, valued not over $12 per dozen (kg): General 8.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 110%.
- 9113.20.90.00 Other (under: Parts) (kg): General 8.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 110%.
- 9113.90 Other (under: Watch straps, watch bands and watch bracelets, and parts thereof).
- 9113.90.40.00 Of textile material (under: Other) (doz.): General 7.2%; Special Free (A+,AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 78.5%.
- 9113.90.80.00 Other (under: Other) (doz.): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.