HTS Heading 9114
Other clock or watch parts
All 13 HTS codes under heading 9114 (other clock or watch parts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.8%, some per unit.
Every line of heading 9114
- 9114 Other clock or watch parts.
- 9114.30 Dials (under: Other clock or watch parts).
- 9114.30.40.00 Not exceeding 50 mm in width (under: Dials) (No.): General 0.4¢ each + 7.2%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 5¢ each + 45%.
- 9114.30.80.00 Exceeding 50 mm in width (under: Dials) (No.): General 4.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 50%.
- 9114.40 Plates and bridges (under: Other clock or watch parts).
- 9114.40.20.00 Watch movement bottom or pillar plates or their equivalent (No.): General 12¢ each; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 75¢ each.
- 9114.40.40.00 Any plate, or set of plates, suitable for assembling thereon a clock movement (No.): General 10¢ each; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 38¢ each.
- 9114.40.60.00 For watches (under: Other) (No.): General 7.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 65%.
- 9114.40.80.00 Other (under: Other) (No.): General 4.2%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 65%.
- 9114.90 Other (under: Other clock or watch parts).
- 9114.90.10.00 Jewels (under: Other) (No.): General Free; Special none; Column 2 10%.
- 9114.90.15.00 For watch movements (under: Assemblies and subassemblies for watch or clock movements consisting of two or more pieces or parts fastened or joined inseparably together) (kg): General 7.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 45%.
- 9114.90.30.00 For clock movements (under: Assemblies and subassemblies for watch or clock movements consisting of two or more pieces or parts fastened or joined inseparably together) (kg): General 6% + 2.3¢/jewel + 0.2¢ for each other piece or part, but if consisting in part of a plate or a set of plates the total duty shall not exceed the duty for the complete movement; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 65% + 25¢/jewel + 3¢ for each other piece or part, but if consisting in part of a plate or a set of plates the total duty shall not exceed the duty for the complete movement.
- 9114.90.34.00 For watches (under: Springs, including hairsprings) (No.): General 7.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 65%.
- 9114.90.38.00 Other (under: Springs, including hairsprings) (No.): General 4.2%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 65%.
- 9114.90.40.00 For watches (under: Other) (kg): General 8.8%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,R,S,SG); Column 2 65%.
- 9114.90.50.00 Other (under: Other) (kg): General 4.2%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 65%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.