HTS Heading 9201
Pianos, including player pianos; harpsichords and other keyboard stringed instruments
All 12 HTS codes under heading 9201 (pianos, including player pianos), with their duty rates from the 2026 HTS Revision 23. General duty 3.5% to 4.7%.
Every line of heading 9201
- 9201 Pianos, including player pianos; harpsichords and other keyboard stringed instruments.
- 9201.10.00 Upright pianos (under: Pianos, including player pianos; harpsichords and other keyboard stringed instruments): General 4.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9201.10.00.05 Used (under: Upright pianos) (No.).
- 9201.10.00.11 Containing a case measuring less than 111.76 cm in height (No.).
- 9201.10.00.21 Containing a case measuring 111.76 cm or more but less than 121.92 cm in height (No.).
- 9201.10.00.31 Containing a case measuring 121.92 cm or more but less than 129.54 cm in height (No.).
- 9201.10.00.41 Containing a case measuring 129.54 cm or more in height (No.).
- 9201.20.00 Grand pianos (under: Pianos, including player pianos; harpsichords and other keyboard stringed instruments): General 4.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9201.20.00.05 Used (under: Grand pianos) (No.).
- 9201.20.00.11 Containing a case measuring less than 152.40 cm in length (No.).
- 9201.20.00.21 Containing a case measuring 152.40 cm or more but less than 167.64 cm in length (No.).
- 9201.20.00.31 Containing a case measuring 167.64 cm or more but less than 180.34 cm in length (No.).
- 9201.20.00.41 Containing a case measuring 180.34 cm or more but less than 195.58 cm in length (No.).
- 9201.20.00.51 Containing a case measuring 195.58 cm or more in length (No.).
- 9201.90.00.00 Other (under: Pianos, including player pianos; harpsichords and other keyboard stringed instruments) (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.