HTS Heading 9202
Other string musical instruments (for example, guitars, violins, harps)
All 4 HTS codes under heading 9202 (other string musical instruments), with their duty rates from the 2026 HTS Revision 23. General duty 3.2% to 8.7%.
Every line of heading 9202
- 9202 Other string musical instruments (for example, guitars, violins, harps).
- 9202.10.00.00 Played with a bow (under: Other string musical instruments (for example, guitars, violins, harps)) (No.): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 9202.90 Other (under: Other string musical instruments (for example, guitars, violins, harps)).
- 9202.90.20.00 Valued not over $100 each, excluding the value of the case (No.): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9202.90.40.00 Other (under: Guitars) (No.): General 8.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9202.90.60.00 Other (under: Other) (No.): General 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.