HTS Heading 9205

Wind musical instruments (for example, keyboard pipe organs, accordions, clarinets, trumpets, bagpipes), other than fairground organs and mechanical street organs

All 13 HTS codes under heading 9205 (wind musical instruments), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.9%.

Every line of heading 9205

  • 9205 Wind musical instruments (for example, keyboard pipe organs, accordions, clarinets, trumpets, bagpipes), other than fairground organs and mechanical street organs.
  • 9205.10.00 Brass-wind instruments (under: Wind musical instruments (for example, keyboard pipe organs, accordions, clarinets, trumpets, bagpipes), other than fairground organs and mechanical street organs): General 2.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9205.10.00.40 Valued not over $10 each (under: Brass-wind instruments) (No.).
  • 9205.10.00.80 Valued over $10 each (under: Brass-wind instruments) (No.).
  • 9205.90 Other (under: Wind musical instruments (for example, keyboard pipe organs, accordions, clarinets, trumpets, bagpipes), other than fairground organs and mechanical street organs).
  • 9205.90.12.00 Keyboard pipe organs (under: Keyboard pipe organs; harmoniums and similar keyboard instruments with free metal reeds) (No.): General Free; Special none; Column 2 35%.
  • 9205.90.14.00 Other (under: Keyboard pipe organs; harmoniums and similar keyboard instruments with free metal reeds) (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9205.90.15.00 Piano accordions (under: Accordions and similar instruments) (No.): General Free; Special none; Column 2 40%.
  • 9205.90.18.00 Other (under: Accordions and similar instruments) (No.): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9205.90.19.00 Mouth organs (under: Accordions and similar instruments; mouth organs) (doz.): General Free; Special none; Column 2 40%.
  • 9205.90.20.00 Bagpipes (under: Woodwind instruments) (No.): General Free; Special none; Column 2 40%.
  • 9205.90.40 Other (under: Woodwind instruments): General 4.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9205.90.40.20 Clarinets (under: Other) (No.).
  • 9205.90.40.40 Saxophones (under: Other) (No.).
  • 9205.90.40.60 Flutes and piccolos (except bamboo) (No.).
  • 9205.90.40.80 Other (under: Other) (No.).
  • 9205.90.60.00 Other (under: Other) (No.): General Free; Special none; Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.