HTS Heading 9302
Revolvers and pistols, other than those of heading 9303 or 9304
All 3 HTS codes under heading 9302 (revolvers and pistols), with their duty rates from the 2026 HTS Revision 23. General duty 3%, some per unit.
Every line of heading 9302
- 9302.00.00 Revolvers and pistols, other than those of heading 9303 or 9304: General 14¢ each + 3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 $3.50 each + 55%.
- 9302.00.00.20 Revolvers (under: Revolvers and pistols, other than those of heading 9303 or 9304) (No.).
- 9302.00.00.40 Semiautomatic pistols (under: Revolvers and pistols, other than those of heading 9303 or 9304) (No.).
- 9302.00.00.90 Other (under: Revolvers and pistols, other than those of heading 9303 or 9304) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.