HTS Heading 9303

Other firearms and similar devices which operate by the firing of an explosive charge (for example, sporting shot- guns and rifles, muzzle-loading firearms, Very pistols and other devices designed to project only signal flares, pistols and revolvers for firing blank ammunition, captive-bolt humane killers, line-throwing guns)

All 17 HTS codes under heading 9303 (other firearms), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.2%.

Every line of heading 9303

  • 9303 Other firearms and similar devices which operate by the firing of an explosive charge (for example, sporting shot- guns and rifles, muzzle-loading firearms, Very pistols and other devices designed to project only signal flares, pistols and revolvers for firing blank ammunition, captive-bolt humane killers, line-throwing guns).
  • 9303.10.00.00 Muzzle-loading firearms (under: Other firearms and similar devices which operate by the firing of an explosive charge (for example, sporting shot- guns and rifles, muzzle-loading firearms, Very pistols and other devices designed to project only signal flares, pistols and revolvers for firing blank ammunition, captive-bolt humane killers, line-throwing guns)) (No.): General Free; Special none; Column 2 Free.
  • 9303.20.00 Other sporting, hunting or target-shooting shotguns, including combination shotgun-rifles: General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 9303.20.00.20 Autoloading (under: Shotguns) (No.).
  • 9303.20.00.30 Pump action (under: Shotguns) (No.).
  • 9303.20.00.40 Over and under (under: Shotguns) (No.).
  • 9303.20.00.65 Other (under: Shotguns) (No.).
  • 9303.20.00.80 Combination shotgun-rifles (under: Other sporting, hunting or target-shooting shotguns, including combination shotgun-rifles) (No.).
  • 9303.30 Other sporting, hunting or target-shooting rifles.
  • 9303.30.40 Valued over $25 but not over $50 each: General 3.8% on the value of the rifle + 10% on the value of the telescopic sight, if any; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 9303.30.40.10 Telescopic sights imported with rifles (No.).
  • 9303.30.40.20 Centerfire (under: Rifles) (No.).
  • 9303.30.40.30 Rimfire (under: Rifles) (No.).
  • 9303.30.80 Other (under: Other sporting, hunting or target-shooting rifles): General 3.1% on the value of the rifle + 13% on the value of the telescopic sight, if any; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 9303.30.80.05 Telescopic sights imported with rifles (No.).
  • 9303.30.80.10 Autoloading (under: Centerfire) (No.).
  • 9303.30.80.12 Single shot (under: Bolt action) (No.).
  • 9303.30.80.17 Other (under: Bolt action) (No.).
  • 9303.30.80.25 Other (under: Centerfire) (No.).
  • 9303.30.80.30 Rimfire (under: Rifles) (No.).
  • 9303.90 Other (under: Other firearms and similar devices which operate by the firing of an explosive charge (for example, sporting shot- guns and rifles, muzzle-loading firearms, Very pistols and other devices designed to project only signal flares, pistols and revolvers for firing blank ammunition, captive-bolt humane killers, line-throwing guns)).
  • 9303.90.40.00 Pistols and revolvers designed to fire only blank cartridges or blank ammunition (No.): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 105%.
  • 9303.90.80.00 Other (under: Other) (No.): General Free; Special none; Column 2 27.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.