HTS Heading 9304

Other arms (for example, spring, air or gas guns and pistols, truncheons), excluding those of heading 9307

All 3 HTS codes under heading 9304 (other arms), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.7%.

Every line of heading 9304

  • 9304.00 Other arms (for example, spring, air or gas guns and pistols, truncheons), excluding those of heading 9307.
  • 9304.00.20.00 Rifles (under: Pistols, rifles and other guns which eject missiles by release of compressed air or gas, or by the release of a spring mechanism or rubber held under tension) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
  • 9304.00.40.00 Other (under: Pistols, rifles and other guns which eject missiles by release of compressed air or gas, or by the release of a spring mechanism or rubber held under tension) (No.): General Free; Special none; Column 2 27.5%.
  • 9304.00.60.00 Other (under: Other arms (for example, spring, air or gas guns and pistols, truncheons), excluding those of heading 9307) (No.): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.