HTS Heading 9401

Seats (other than those of heading 9402), whether or not convertible into beds, and parts thereof

All 88 HTS codes under heading 9401 (seats (other than those of heading 9402)), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 9401

  • 9401 Seats (other than those of heading 9402), whether or not convertible into beds, and parts thereof.
  • 9401.10 Seats of a kind used for aircraft.
  • 9401.10.40.00 Leather upholstered (under: Seats of a kind used for aircraft) (No.): General Free; Special none; Column 2 45%.
  • 9401.10.80.00 Other (under: Seats of a kind used for aircraft) (No.): General Free; Special none; Column 2 45%.
  • 9401.20.00.00 Seats of a kind used for motor vehicles (No.): General Free; Special none; Column 2 25%.
  • 9401.31.00.00 Of wood (under: Swivel seats with variable height adjustment) (No.): General Free; Special none; Column 2 45%.
  • 9401.39.00 Other (under: Swivel seats with variable height adjustment): General Free; Special none; Column 2 45%.
  • 9401.39.00.10 Household (under: Other) (No.).
  • 9401.39.00.30 Other (under: Other) (No.).
  • 9401.41.00.00 Of wood (under: Seats other than garden seats or camping equipment, convertible into beds) (No.): General Free; Special none; Column 2 40%.
  • 9401.49.00.00 Other (under: Seats other than garden seats or camping equipment, convertible into beds) (No.): General Free; Special none; Column 2 40%.
  • 9401.52.00.00 Of bamboo (under: Seats of cane, osier, bamboo or similar materials) (No.): General Free; Special none; Column 2 60%.
  • 9401.53.00.00 Of rattan (under: Seats of cane, osier, bamboo or similar materials) (No.): General Free; Special none; Column 2 60%.
  • 9401.59.00.00 Other (under: Seats of cane, osier, bamboo or similar materials) (No.): General Free; Special none; Column 2 60%.
  • 9401.61 Upholstered (under: Other seats, with wooden frames).
  • 9401.61.20 Of teak (under: Chairs): General Free; Special none; Column 2 40%.
  • 9401.61.20.11 Of plantation-harvested teak (under: Household) (No.).
  • 9401.61.20.15 Other (under: Household) (No.).
  • 9401.61.20.31 Of plantation-harvested teak (under: Other) (No.).
  • 9401.61.20.35 Other (under: Other) (No.).
  • 9401.61.40 Other (under: Chairs): General Free; Special none; Column 2 40%.
  • 9401.61.40.01 Chairs for children, including highchairs (No.).
  • 9401.61.40.11 Other household (under: Other) (No.).
  • 9401.61.40.31 Other (under: Other) (No.).
  • 9401.61.60 Other (under: Upholstered): General Free; Special none; Column 2 40%.
  • 9401.61.60.01 Stationary activity centers for children (No.).
  • 9401.61.60.05 Other seats for children (under: Other) (No.).
  • 9401.61.60.11 Other household (under: Other) (No.).
  • 9401.61.60.31 Other (under: Other) (No.).
  • 9401.69 Other (under: Other seats, with wooden frames).
  • 9401.69.20 Bent-wood seats (under: Other): General Free; Special none; Column 2 42.5%.
  • 9401.69.20.10 Household (under: Bent-wood seats) (No.).
  • 9401.69.20.30 Other (under: Bent-wood seats) (No.).
  • 9401.69.40 Of teak (under: Chairs): General Free; Special none; Column 2 40%.
  • 9401.69.40.11 Of plantation-harvested teak (under: Household) (No.).
  • 9401.69.40.15 Other (under: Household) (No.).
  • 9401.69.40.31 Of plantation-harvested teak (under: Other) (No.).
  • 9401.69.40.35 Other (under: Other) (No.).
  • 9401.69.60 Other (under: Chairs): General Free; Special none; Column 2 40%.
  • 9401.69.60.01 Chairs for children including highchairs (No.).
  • 9401.69.60.11 Other household (under: Other) (No.).
  • 9401.69.60.31 Other (under: Other) (No.).
  • 9401.69.80 Other (under: Other): General Free; Special none; Column 2 40%.
  • 9401.69.80.01 Stationary activity centers for children (No.).
  • 9401.69.80.05 Other seats for children (under: Other) (No.).
  • 9401.69.80.11 Other household (under: Other) (No.).
  • 9401.69.80.66 Of plantation-harvested teak (under: Of teak (Tectona spp.)) (No.).
  • 9401.69.80.68 Other (under: Of teak (Tectona spp.)) (No.).
  • 9401.69.80.90 Other (under: Other) (No.).
  • 9401.71.00 Upholstered (under: Other seats, with metal frames): General Free; Special none; Column 2 45%.
  • 9401.71.00.01 Highchairs and booster seats (under: Upholstered) (No.).
  • 9401.71.00.05 Infant walkers (under: Upholstered) (No.).
  • 9401.71.00.06 Bouncers with seats (under: Upholstered) (No.).
  • 9401.71.00.07 Swings for children (under: Upholstered) (No.).
  • 9401.71.00.08 Stationary activity centers for children (No.).
  • 9401.71.00.11 Other household (under: Upholstered) (No.).
  • 9401.71.00.31 Other (under: Upholstered) (No.).
  • 9401.79.00 Other (under: Other seats, with metal frames): General Free; Special none; Column 2 45%.
  • 9401.79.00.01 Highchairs and booster seats (under: Other) (No.).
  • 9401.79.00.02 Infant walkers (under: Other) (No.).
  • 9401.79.00.03 Bouncers with seats (under: Other) (No.).
  • 9401.79.00.04 Swings for children (under: Other) (No.).
  • 9401.79.00.06 Stationary activity centers for children (No.).
  • 9401.79.00.11 Household (under: With textile covered cushions or textile seating or backing material) (No.).
  • 9401.79.00.15 Other (under: With textile covered cushions or textile seating or backing material) (No.).
  • 9401.79.00.25 Household (under: Other) (No.).
  • 9401.79.00.35 Other (under: Other) (No.).
  • 9401.79.00.46 Household (under: Other) (No.).
  • 9401.79.00.50 Other (under: Other) (No.).
  • 9401.80 Other seats (under: Seats (other than those of heading 9402), whether or not convertible into beds, and parts thereof).
  • 9401.80.20 Of reinforced or laminated plastics: General Free; Special none; Column 2 65%.
  • 9401.80.20.01 Childrenʼs highchairs and booster seats except for motor vehicle; bath seats, infant walkers, bouncers with seats, swings for children (No.).
  • 9401.80.20.05 Stationary activity centers for children (No.).
  • 9401.80.20.11 Other household (under: Of reinforced or laminated plastics) (No.).
  • 9401.80.20.31 Other (under: Of reinforced or laminated plastics) (No.).
  • 9401.80.40 Other (under: Of rubber or plastics): General Free; Special none; Column 2 25%.
  • 9401.80.40.01 Childrenʼs highchairs and booster seats except for motor vehicle; bath seats, infant walkers, bouncers with seats, swings for children (No.).
  • 9401.80.40.04 Stationary activity centers for children (No.).
  • 9401.80.40.06 Household (under: With textile covered cushions or textile seating or backing material) (No.).
  • 9401.80.40.15 Other (under: With textile covered cushions or textile seating or backing material) (No.).
  • 9401.80.40.26 Household (under: Other) (No.).
  • 9401.80.40.35 Other (under: Other) (No.).
  • 9401.80.40.46 Other (under: Other) (No.).
  • 9401.80.60 Other (under: Other seats): General Free; Special none; Column 2 45%.
  • 9401.80.60.21 With detachable hard-shell seat (No.).
  • 9401.80.60.23 Other (under: Child safety seats) (No.).
  • 9401.80.60.24 Stationary activity centers for children (No.).
  • 9401.80.60.25 Other seats for children (under: Other) (No.).
  • 9401.80.60.28 Other household (under: Other) (No.).
  • 9401.80.60.30 Other (under: Other) (No.).
  • 9401.91 Of wood (under: Parts).
  • 9401.91.15.00 Of seats of a kind used for motor vehicles (No.): General Free; Special none; Column 2 25%.
  • 9401.91.20.00 Of bent wood seats (under: Of wood) (No.): General Free; Special none; Column 2 42.5%.
  • 9401.91.90 Other (under: Of wood): General Free; Special none; Column 2 40%.
  • 9401.91.90.10 For children’s highchairs, booster seats, and similar seats (No.).
  • 9401.91.90.90 Other (under: Other) (No.).
  • 9401.99 Other (under: Parts).
  • 9401.99.10 Of seats of a kind used for motor vehicles: General Free; Special none; Column 2 25%.
  • 9401.99.10.10 Of leather, cut to shape (under: Of seats of a kind used for motor vehicles) (No.).
  • 9401.99.10.20 Of textile material, cut to shape (No.).
  • 9401.99.10.85 Other (under: Of seats of a kind used for motor vehicles) (No.).
  • 9401.99.25 Of cane, osier, bamboo or similar materials: General Free; Special none; Column 2 60%.
  • 9401.99.25.40 Of rattan (under: Of cane, osier, bamboo or similar materials) (No.).
  • 9401.99.25.80 Other (under: Of cane, osier, bamboo or similar materials) (No.).
  • 9401.99.35 Of rubber or plastics (under: Other): General Free; Special none; Column 2 25%.
  • 9401.99.35.10 For children’s highchairs, booster seats except for motor vehicle and similar seats (No.).
  • 9401.99.35.80 Other (under: Of rubber or plastics) (No.).
  • 9401.99.90 Other (under: Other): General Free; Special none; Column 2 45%.
  • 9401.99.90.05 For children’s highchairs, booster seats and similar seats (No.).
  • 9401.99.90.21 Other of textile material, cut to shape (No.).
  • 9401.99.90.30 Mechanically collapsible sofa bed seat deck components, covered or uncovered as described in statistical note 2 to this chapter (No.).
  • 9401.99.90.40 Of seats of a kind used for aircraft (No.).
  • 9401.99.90.85 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.