HTS Chapter 94
Furniture; bedding, mattresses, cushions; luminaires and lighting fittings; illuminated signs; prefabricated buildings
The 6 headings and 275 HTS codes of chapter 94 (furniture), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 94
- 9401: Seats (other than those of heading 9402), whether or not convertible into beds, and parts thereof (88 codes, General duty Free)
- 9402: Medical, surgical, dental or veterinary furniture (for example, operating tables, examination tables, hospital beds with mechanical fittings, dentists' chairs); barbers' chairs and similar chairs, having rotating as well as both reclining and elevating movements; parts of the foregoing articles (3 codes, General duty Free)
- 9403: Other furniture and parts thereof (86 codes, General duty Free)
- 9404: Mattress supports; articles of bedding and similar furnishing (for example, mattresses, quilts, eiderdowns, cushions, pouffes and pillows) fitted with springs or stuffed or internally fitted with any material or of cellular rubber or plastics, whether or not covered (33 codes, General duty Free to 12.8%)
- 9405: Luminaires and lighting fittings including searchlights and spotlights and parts thereof, not elsewhere specified or included; illuminated signs, illuminated nameplates and the like, having a permanently fixed light source, and parts thereof not elsewhere specified or included (58 codes, General duty Free to 12%)
- 9406: Prefabricated buildings (7 codes, General duty 2.6% to 2.9%)
Where it sits in the schedule
Chapter 94 is in Section XX of the Harmonized System, miscellaneous manufactured articles (chapters 94 to 96). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.