HTS Heading 9402

Medical, surgical, dental or veterinary furniture (for example, operating tables, examination tables, hospital beds with mechanical fittings, dentists' chairs); barbers' chairs and similar chairs, having rotating as well as both reclining and elevating movements; parts of the foregoing articles

All 3 HTS codes under heading 9402 (medical, surgical), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 9402

  • 9402 Medical, surgical, dental or veterinary furniture (for example, operating tables, examination tables, hospital beds with mechanical fittings, dentists' chairs); barbers' chairs and similar chairs, having rotating as well as both reclining and elevating movements; parts of the foregoing articles.
  • 9402.10.00.00 Dentists', barbers' or similar chairs and parts thereof (No.): General Free; Special none; Column 2 35%.
  • 9402.90.00 Other (under: Medical, surgical, dental or veterinary furniture (for example, operating tables, examination tables, hospital beds with mechanical fittings, dentists' chairs); barbers' chairs and similar chairs, having rotating as well as both reclining and elevating movements; parts of the foregoing articles): General Free; Special none; Column 2 40%.
  • 9402.90.00.10 Hospital beds (under: Other) (No.).
  • 9402.90.00.20 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.