HTS Heading 9405
Luminaires and lighting fittings including searchlights and spotlights and parts thereof, not elsewhere specified or included; illuminated signs, illuminated nameplates and the like, having a permanently fixed light source, and parts thereof not elsewhere specified or included
All 58 HTS codes under heading 9405 (luminaires), with their duty rates from the 2026 HTS Revision 23. General duty Free to 12%.
Every line of heading 9405
- 9405 Luminaires and lighting fittings including searchlights and spotlights and parts thereof, not elsewhere specified or included; illuminated signs, illuminated nameplates and the like, having a permanently fixed light source, and parts thereof not elsewhere specified or included.
- 9405.11 Designed for use solely with light-emitting diode (LED) light sources.
- 9405.11.40 Of brass (under: Of base metal): General 3.9%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.11.40.10 Household (under: Of brass) (No.).
- 9405.11.40.20 Other (under: Of brass) (No.).
- 9405.11.60 Other (under: Of base metal): General 7.6%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.11.60.10 Household (under: Other) (No.).
- 9405.11.60.20 Other (under: Other) (No.).
- 9405.11.80 Other (under: Designed for use solely with light-emitting diode (LED) light sources): General 3.9%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9405.11.80.10 Household (under: Other) (No.).
- 9405.11.80.20 Other (under: Other) (No.).
- 9405.19 Other (under: Chandeliers and other electric ceiling or wall lighting fittings, excluding those of a kind used for lighting public open spaces or thoroughfares).
- 9405.19.40 Of brass (under: Of base metal): General 3.9%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.19.40.10 Household (under: Of brass) (No.).
- 9405.19.40.20 Other (under: Of brass) (No.).
- 9405.19.60 Other (under: Of base metal): General 7.6%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.19.60.10 Household (under: Other) (No.).
- 9405.19.60.20 Other (under: Other) (No.).
- 9405.19.80 Other (under: Other): General 3.9%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9405.19.80.10 Household (under: Other) (No.).
- 9405.19.80.20 Other (under: Other) (No.).
- 9405.21 Designed for use solely with light-emitting diode (LED) light sources.
- 9405.21.40 Of brass (under: Of base metal): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9405.21.40.10 Household (under: Of brass) (No.).
- 9405.21.40.20 Other (under: Of brass) (No.).
- 9405.21.60 Other (under: Of base metal): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.21.60.10 Household (under: Other) (No.).
- 9405.21.60.20 Other (under: Other) (No.).
- 9405.21.80 Other (under: Designed for use solely with light-emitting diode (LED) light sources): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9405.21.80.10 Household (under: Other) (No.).
- 9405.21.80.20 Other (under: Other) (No.).
- 9405.29 Other (under: Electric table, desk, bedside or floor-standing luminaires).
- 9405.29.40 Of brass (under: Of base metal): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9405.29.40.10 Household (under: Of brass) (No.).
- 9405.29.40.20 Other (under: Of brass) (No.).
- 9405.29.60 Other (under: Of base metal): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.29.60.10 Household (under: Other) (No.).
- 9405.29.60.20 Other (under: Other) (No.).
- 9405.29.80 Other (under: Other): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9405.29.80.10 Household (under: Other) (No.).
- 9405.29.80.20 Other (under: Other) (No.).
- 9405.31.00 Designed for use solely with light-emitting diode (LED) light sources: General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 9405.31.00.10 Miniature series wired sets (under: Designed for use solely with light-emitting diode (LED) light sources) (No.).
- 9405.31.00.40 Other (under: Designed for use solely with light-emitting diode (LED) light sources) (No.).
- 9405.39.00 Other (under: Lighting strings of a kind used for Christmas trees): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 9405.39.00.10 Miniature series wired sets (under: Other) (No.).
- 9405.39.00.40 Other (under: Other) (No.).
- 9405.41 Photovoltaic, designed for use solely with light- emitting diode (LED) light sources.
- 9405.41.40.00 Of brass (under: Of base metal) (No.): General 4.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.41.60.00 Other (under: Of base metal) (No.): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.41.82.00 Light-emitting diode (LED) backlights modules, the foregoing which are lighting sources that consist of one or more LEDs and one or more connectors and are mounted on a printed circuit or other similar substrate, and other passive components, whether or not combined with optical components or protective diodes, and used as backlights illumination for liquid crystal displays(LCDs) (No.): General Free; Special none; Column 2 35%.
- 9405.41.84 Other (under: Other): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9405.41.84.10 Other lighting sets (under: Other) (No.).
- 9405.41.84.40 Other (under: Other) (No.).
- 9405.42 Other, designed for use solely with light-emitting diode (LED) light sources.
- 9405.42.40.00 Of brass (under: Of base metal) (No.): General 4.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.42.60.00 Other (under: Of base metal) (No.): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.42.82.00 Light-emitting diode (LED) backlights modules, the foregoing which are lighting sources that consist of one or more LEDs and one or more connectors and are mounted on a printed circuit or other similar substrate, and other passive components, whether or not combined with optical components or protective diodes, and used as backlights illumination for liquid crystal displays(LCDs) (No.): General Free; Special none; Column 2 35%.
- 9405.42.84 Other (under: Other): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9405.42.84.10 Other lighting sets (under: Other) (No.).
- 9405.42.84.40 Other (under: Other) (No.).
- 9405.49.00.00 Other (under: Other electric luminaires and lighting fittings) (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9405.50 Non-electrical luminaires and lighting fittings.
- 9405.50.20.00 Incandescent luminaires designed to be operated by propane or other gas, or by compressed air and kerosene or gasoline (No.): General 2.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.50.30.00 Of brass (under: Other) (No.): General 5.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.50.40.00 Other (under: Other) (No.): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.61 Designed for use solely with light-emitting diode (LED) light sources.
- 9405.61.20.00 Of brass (under: Of base metal) (No.): General 5.7%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.61.40.00 Other (under: Of base metal) (No.): General 6%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.61.60.00 Other (under: Designed for use solely with light-emitting diode (LED) light sources) (No.): General 5.3%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 9405.69 Other (under: Illuminated signs, illuminated name-plates and the like).
- 9405.69.20.00 Of brass (under: Of base metal) (No.): General 5.7%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.69.40.00 Other (under: Of base metal) (No.): General 6%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.69.60.00 Other (under: Other) (No.): General 5.3%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 9405.91 Of glass (under: Parts).
- 9405.91.10.00 Of lead crystal (under: Globes and shades) (No.): General 12%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
- 9405.91.30.00 Other (under: Globes and shades) (No.): General 12%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
- 9405.91.40.00 Chimneys (under: Of glass) (doz.): General 7.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 9405.91.60 Other (under: Of glass): General 4.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 9405.91.60.40 Prisms and other glass articles of a kind used in chandeliers and wall brackets, and articles thereof (kg).
- 9405.91.60.80 Other (under: Other) (kg).
- 9405.92.00.00 Of plastics (under: Parts) (kg): General 3.7%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 9405.99 Other (under: Parts).
- 9405.99.20.00 Of brass (under: Other) (kg): General 3.9%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.99.40 Other (under: Other): General 6%; Special Free (A,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9405.99.40.10 Lampposts and bases for lampposts, of cast iron (No.).
- 9405.99.40.20 Lampposts and bases for lampposts, of aluminum (No.).
- 9405.99.40.90 Other (under: Other) (kg, No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.