HTS Heading 9404

Mattress supports; articles of bedding and similar furnishing (for example, mattresses, quilts, eiderdowns, cushions, pouffes and pillows) fitted with springs or stuffed or internally fitted with any material or of cellular rubber or plastics, whether or not covered

All 33 HTS codes under heading 9404 (mattress supports), with their duty rates from the 2026 HTS Revision 23. General duty Free to 12.8%.

Every line of heading 9404

  • 9404 Mattress supports; articles of bedding and similar furnishing (for example, mattresses, quilts, eiderdowns, cushions, pouffes and pillows) fitted with springs or stuffed or internally fitted with any material or of cellular rubber or plastics, whether or not covered.
  • 9404.10.00 Mattress supports (under: Mattress supports; articles of bedding and similar furnishing (for example, mattresses, quilts, eiderdowns, cushions, pouffes and pillows) fitted with springs or stuffed or internally fitted with any material or of cellular rubber or plastics, whether or not covered): General Free; Special none; Column 2 45%.
  • 9404.10.00.20 Of a kind used in combination with a mattress, made of wood, whether covered or uncovered (No.).
  • 9404.10.00.50 Other (under: Mattress supports) (No.).
  • 9404.21.00 Of cellular rubber or plastics, whether or not covered: General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9404.21.00.10 For use in a crib or toddler bed (No.).
  • 9404.21.00.13 Of a width exceeding 91 cm, of a length exceeding 184 cm, and a depth exceeding 8 cm (No.).
  • 9404.21.00.95 Other (under: Of cellular rubber or plastics, whether or not covered) (No.).
  • 9404.29 Of other materials (under: Mattresses).
  • 9404.29.10 Of cotton (under: Of other materials): General 3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 40%.
  • 9404.29.10.05 For use in a crib or toddler bed (No.).
  • 9404.29.10.13 Of a width exceeding 91 cm, of a length exceeding 184 cm, and a depth exceeding 8 cm (No.).
  • 9404.29.10.95 Other (under: Of cotton) (No.).
  • 9404.29.90 Other (under: Of other materials): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9404.29.90.05 For use in a crib or toddler bed (No.).
  • 9404.29.90.13 Of a width exceeding 91 cm, of a length exceeding 184 cm, and of a depth exceeding 8 cm (No.).
  • 9404.29.90.50 Other (under: Uncovered innerspring units) (No.).
  • 9404.29.90.85 For use in a crib or toddler bed (No.).
  • 9404.29.90.87 Of a width exceeding 91 cm, of a length exceeding 184 cm, and a depth exceeding 8 cm (No.).
  • 9404.29.90.95 Other (under: Other) (No.).
  • 9404.30 Sleeping bags (under: Mattress supports; articles of bedding and similar furnishing (for example, mattresses, quilts, eiderdowns, cushions, pouffes and pillows) fitted with springs or stuffed or internally fitted with any material or of cellular rubber or plastics, whether or not covered).
  • 9404.30.40.00 Containing 20 percent or more by weight of feathers and/or down (No.): General 4.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 9404.30.80.00 Other (under: Sleeping bags) (No.): General 9%; Special Free (AU,BH, CL,CO,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 78.5%.
  • 9404.40 Quilts, bedspreads, eiderdowns and duvets (comforters).
  • 9404.40.10.00 Of cotton, not containing any embroidery, lace, braid, edging, trimming, piping exceeding 6.35 mm or applique work (362) (No., kg): General 4.4%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 9404.40.90 Other (under: Quilts, bedspreads, eiderdowns and duvets (comforters)): General 12.8%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 9404.40.90.05 With outer shell of cotton (362) (No., kg).
  • 9404.40.90.22 With outer shell of man-made fibers (666) (No., kg).
  • 9404.40.90.23 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 9404.40.90.36 Other (899) (under: With outer shell of other textile materials) (No., kg).
  • 9404.90 Other (under: Mattress supports; articles of bedding and similar furnishing (for example, mattresses, quilts, eiderdowns, cushions, pouffes and pillows) fitted with springs or stuffed or internally fitted with any material or of cellular rubber or plastics, whether or not covered).
  • 9404.90.10 Of cotton (369) (under: Pillows, cushions and similar furnishings): General 5.3%; Special Free (AU,BH,CL, CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9404.90.10.30 Foam fill (369) (under: Bed pillows (with outer covering of cotton), of a kind described in statistical note 6 to this chapter) (No., kg).
  • 9404.90.10.60 Other fill (369) (under: Bed pillows (with outer covering of cotton), of a kind described in statistical note 6 to this chapter) (No., kg).
  • 9404.90.10.90 Other (369) (under: Of cotton (369)) (No., kg).
  • 9404.90.20 Other (under: Pillows, cushions and similar furnishings): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 9404.90.20.30 Foam fill (under: Bed pillows, of a kind described in statistical note 6 to this chapter) (No.).
  • 9404.90.20.60 Other fill (under: Bed pillows, of a kind described in statistical note 6 to this chapter) (No.).
  • 9404.90.20.90 Other (under: Other) (No.).
  • 9404.90.81.00 Of cotton, not containing any embroidery, lace, braid, edging, trimming, piping exceeding 6.35 mm or applique work (369) (No., kg): General 4.4%; Special Free (AU,BH,CL, CO,E*,IL,JO,KR, MA,OM,P,PA, PE,S,SG); Column 2 25%.
  • 9404.90.96 Other (under: Other): General 7.3%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 9404.90.96.05 With outer shell of cotton (369) (No., kg).
  • 9404.90.96.22 With outer shell of man-made fibers (666) (No., kg).
  • 9404.90.96.23 Containing 85 percent or more by weight of silk or silk waste (No., kg).
  • 9404.90.96.36 Other (899) (under: With outer shell of other textile materials) (No., kg).
  • 9404.90.96.70 Other (under: Other) (No., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.