HTS Heading 9601
Worked ivory, bone, tortoise-shell, horn, antlers, coral, mother-of-pearl and other animal carving material, and articles of these materials (including articles obtained by molding)
All 5 HTS codes under heading 9601 (worked ivory, bone, tortoise-shell, horn), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 9601
- 9601 Worked ivory, bone, tortoise-shell, horn, antlers, coral, mother-of-pearl and other animal carving material, and articles of these materials (including articles obtained by molding).
- 9601.10.00.00 Worked ivory and articles of ivory (No., kg): General Free; Special none; Column 2 35%.
- 9601.90 Other (under: Worked ivory, bone, tortoise-shell, horn, antlers, coral, mother-of-pearl and other animal carving material, and articles of these materials (including articles obtained by molding)).
- 9601.90.20.00 Worked shell and articles thereof (No., kg): General Free; Special none; Column 2 35%.
- 9601.90.40.00 Coral, cut but not set, and cameos, suitable for use in jewelry (kg): General 2.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 9601.90.60.00 Of bone, horn, hoof, whalebone, quill or any combination thereof (No., kg): General Free; Special none; Column 2 25%.
- 9601.90.80.00 Other (under: Other) (No., kg): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.