HTS Chapter 96
Miscellaneous manufactured articles
The 20 headings and 157 HTS codes of chapter 96 (miscellaneous manufactured articles), with their duty rates from the 2026 HTS Revision 23.
The 20 headings of chapter 96
- 9601: Worked ivory, bone, tortoise-shell, horn, antlers, coral, mother-of-pearl and other animal carving material, and articles of these materials (including articles obtained by molding) (5 codes, General duty Free to 3.7%)
- 9602: Worked vegetable or mineral carving material and articles of these materials; molded or carved articles of wax, of stearin, of natural gums or natural resins, of modeling pastes, and other molded or carved articles, not elsewhere specified or included; worked, unhardened gelatin (except gelatin of heading 3503) and articles of unhardened gelatin (5 codes, General duty 1.8% to 3%)
- 9603: Brooms, brushes (including brushes constituting parts of machines, appliances or vehicles), hand-operated mechanical floor sweepers, not motorized, mops and feather dusters; prepared knots and tufts for broom or brush making; paint pads and rollers; squeegees (other than roller squeegees) (26 codes, General duty Free to 32%, some per unit)
- 9604: Hand sieves and hand riddles (1 code, General duty 4.9%)
- 9605: Travel sets for personal toilet, sewing or shoe or clothes cleaning (other than manicure and pedicure sets of heading 8214) (1 code, General duty 8.1%)
- 9606: Buttons, press-fasteners, snap-fasteners and press-studs, button molds and other parts of these articles; button blanks (11 codes, General duty Free to 6%)
- 9607: Slide fasteners and parts thereof (6 codes, General duty 10% to 13%)
- 9608: Ball point pens; felt tipped and other porous-tipped pens and markers; fountain pens, stylograph pens and other pens; duplicating styli; propelling or sliding pencils (for example, mechanical pencils); pen-holders, pencil-holders and similar holders; parts (including caps and clips) of the foregoing articles, other than those of heading 9609 (13 codes, General duty Free to 6.6%, some per unit)
- 9609: Pencils (other than those pencils of heading 9608), crayons, pencil leads, pastels, drawing charcoals, writing or drawing chalks and tailors' chalks (5 codes, General duty Free to 4.3%, some per unit)
- 9610: Slates and boards, with writing or drawing surfaces, whether or not framed (1 code, General duty 3.5%)
- 9611: Date, sealing or numbering stamps and the like, (including devices for printing or embossing labels), designed for operating in the hand; hand-operated composing sticks and hand printing sets incorporating such composing sticks (1 code, General duty 2.7%)
- 9612: Typewriter or similar ribbons, inked or otherwise prepared for giving impressions, whether or not on spools or in cartridges; ink pads, whether or not inked, with or without boxes (6 codes, General duty Free to 7.9%)
- 9613: Cigarette lighters and other lighters, whether or not mechanical or electrical, and parts thereof other than flints and wicks (11 codes, General duty 3.6% to 9%)
- 9614: Smoking pipes (including pipe bowls) and cigar or cigarette holders, and parts thereof (9 codes, General duty Free to 7.2%, some per unit)
- 9615: Combs, hair-slides and the like; hairpins, curling pins, curling grips, hair-curlers and the like, other than those of heading 8516, and parts thereof (12 codes, General duty Free to 11%, some per unit)
- 9616: Scent sprayers and similar toilet sprayers, and mounts and heads therefor; powder puffs and pads for the application of cosmetics or toilet preparations (2 codes, General duty Free to 4.3%)
- 9617: Vacuum flasks and other vacuum vessels, complete; parts thereof other than glass inners (4 codes, General duty 6.9% to 7.2%)
- 9618: Tailors' dummies and other mannequins; automatons and other animated displays used for shopwindow dressing (1 code, General duty 4.4%)
- 9619: Sanitary pads (towels) and tampons, diapers (napkins), diaper liners and similar articles, of any material (21 codes, General duty Free to 16%)
- 9620: Monopods, bipods, tripods and similar articles (16 codes, General duty Free to 5.8%)
Where it sits in the schedule
Chapter 96 is in Section XX of the Harmonized System, miscellaneous manufactured articles (chapters 94 to 96). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.