HTS Heading 9602

Worked vegetable or mineral carving material and articles of these materials; molded or carved articles of wax, of stearin, of natural gums or natural resins, of modeling pastes, and other molded or carved articles, not elsewhere specified or included; worked, unhardened gelatin (except gelatin of heading 3503) and articles of unhardened gelatin

All 5 HTS codes under heading 9602 (worked vegetable or mineral carving material), with their duty rates from the 2026 HTS Revision 23. General duty 1.8% to 3%.

Every line of heading 9602

  • 9602.00 Worked vegetable or mineral carving material and articles of these materials; molded or carved articles of wax, of stearin, of natural gums or natural resins, of modeling pastes, and other molded or carved articles, not elsewhere specified or included; worked, unhardened gelatin (except gelatin of heading 3503) and articles of unhardened gelatin.
  • 9602.00.10 Worked unhardened gelatin and articles thereof: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 9602.00.10.40 Unfilled gelatin capsules (under: Worked unhardened gelatin and articles thereof) (thousands).
  • 9602.00.10.80 Other (under: Worked unhardened gelatin and articles thereof) (No.).
  • 9602.00.40.00 Molded or carved articles of wax (No.): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 9602.00.50 Other (under: Worked vegetable or mineral carving material and articles of these materials; molded or carved articles of wax, of stearin, of natural gums or natural resins, of modeling pastes, and other molded or carved articles, not elsewhere specified or included; worked, unhardened gelatin (except gelatin of heading 3503) and articles of unhardened gelatin): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 9602.00.50.10 Unfilled vegetable capsules (under: Other) (thousands).
  • 9602.00.50.80 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.