HTS Heading 9609
Pencils (other than those pencils of heading 9608), crayons, pencil leads, pastels, drawing charcoals, writing or drawing chalks and tailors' chalks
All 5 HTS codes under heading 9609 (pencils), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.3%, some per unit.
Every line of heading 9609
- 9609 Pencils (other than those pencils of heading 9608), crayons, pencil leads, pastels, drawing charcoals, writing or drawing chalks and tailors' chalks.
- 9609.10.00.00 Pencils and crayons, with leads encased in a sheath (gross): General 14¢/gross + 4.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50¢/gross + 30%.
- 9609.20 Pencil leads, black or colored.
- 9609.20.20.00 Not over 1.5 mm in maximum cross-sectional dimension (gross): General Free; Special none; Column 2 20¢/gross.
- 9609.20.40.00 Over 1.5 mm in maximum cross-sectional dimension (gross): General Free; Special none; Column 2 6¢/gross.
- 9609.90 Other (under: Pencils (other than those pencils of heading 9608), crayons, pencil leads, pastels, drawing charcoals, writing or drawing chalks and tailors' chalks).
- 9609.90.40.00 Tailors' chalks (under: Other) (kg): General Free; Special none; Column 2 25%.
- 9609.90.80.00 Other (under: Other) (gross): General Free; Special none; Column 2 50¢/gross + 30%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.