HTS Heading 9608
Ball point pens; felt tipped and other porous-tipped pens and markers; fountain pens, stylograph pens and other pens; duplicating styli; propelling or sliding pencils (for example, mechanical pencils); pen-holders, pencil-holders and similar holders; parts (including caps and clips) of the foregoing articles, other than those of heading 9609
All 13 HTS codes under heading 9608 (ball point pens), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.6%, some per unit.
Every line of heading 9608
- 9608 Ball point pens; felt tipped and other porous-tipped pens and markers; fountain pens, stylograph pens and other pens; duplicating styli; propelling or sliding pencils (for example, mechanical pencils); pen-holders, pencil-holders and similar holders; parts (including caps and clips) of the foregoing articles, other than those of heading 9609.
- 9608.10.00.00 Ball point pens (under: Ball point pens; felt tipped and other porous-tipped pens and markers; fountain pens, stylograph pens and other pens; duplicating styli; propelling or sliding pencils (for example, mechanical pencils); pen-holders, pencil-holders and similar holders; parts (including caps and clips) of the foregoing articles, other than those of heading 9609) (No.): General 0.8¢ each + 5.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6¢ each + 40%.
- 9608.20.00.00 Felt tipped and other porous-tipped pens and markers (gross): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 9608.30.00 Fountain pens, stylograph pens and other pens: General 0.4¢ each + 2.7%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 6¢ each + 40%.
- 9608.30.00.31 India ink drawing pens (under: Fountain pens, stylograph pens and other pens) (No.).
- 9608.30.00.39 Other (under: Fountain pens, stylograph pens and other pens) (No.).
- 9608.40 Propelling or sliding pencils (for example, mechanical pencils).
- 9608.40.40.00 With a mechanical action for extending, or for extending and retracting, the lead (gross): General 6.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.3% (JP); Column 2 41.5%.
- 9608.40.80.00 Other (under: Propelling or sliding pencils (for example, mechanical pencils)) (gross): General Free; Special none; Column 2 45%.
- 9608.50.00.00 Sets of articles from two or more of the subheadings 9608.10, 9608.20, 9608.30 or 9608.40 (No.): General The rate applicable to each article in the absence of this subheading; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 The rate applicable, to each article in the absence of this subheading.
- 9608.60.00.00 Refills for ball point pens, comprising the ball point and ink reservoir (No.): General 0.4¢ each + 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6¢ each + 40%.
- 9608.91.00.00 Pen nibs and nib points (under: Other) (gross): General Free; Special none; Column 2 20¢/gross.
- 9608.99 Other (under: Other).
- 9608.99.20.00 Refill cartridges (under: Other) (No.): General 0.4¢ each + 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 6¢ each + 40%.
- 9608.99.30.00 Balls for ball point pens (under: Other) (thousands): General 20¢/thousand + 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $2.50/thou- sand + 40%.
- 9608.99.40.00 Parts of articles provided for in subheadings 9608.10 and 9608.30 (other than balls for ball point pens) (No.): General Free; Special none; Column 2 6¢ each + 40%.
- 9608.99.60.00 Other (under: Other) (No.): General Free; Special none; Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.