HTS Heading 9612
Typewriter or similar ribbons, inked or otherwise prepared for giving impressions, whether or not on spools or in cartridges; ink pads, whether or not inked, with or without boxes
All 6 HTS codes under heading 9612 (typewriter or similar ribbons), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.9%.
Every line of heading 9612
- 9612 Typewriter or similar ribbons, inked or otherwise prepared for giving impressions, whether or not on spools or in cartridges; ink pads, whether or not inked, with or without boxes.
- 9612.10 Ribbons (under: Typewriter or similar ribbons, inked or otherwise prepared for giving impressions, whether or not on spools or in cartridges; ink pads, whether or not inked, with or without boxes).
- 9612.10.10 Measuring less than 30 mm in width, permanently put up in plastic or metal cartridges (whether or not containing spools) of a kind used in typewriters, automatic data processing or other machines: General Free; Special none; Column 2 78.5%.
- 9612.10.10.10 Woven, of man-made fibers (under: Measuring less than 30 mm in width, permanently put up in plastic or metal cartridges (whether or not containing spools) of a kind used in typewriters, automatic data processing or other machines) (doz., kg).
- 9612.10.10.20 Other (under: Measuring less than 30 mm in width, permanently put up in plastic or metal cartridges (whether or not containing spools) of a kind used in typewriters, automatic data processing or other machines) (doz., kg).
- 9612.10.90 Other (under: Ribbons): General 7.9%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.95% (JP); Column 2 78.5%.
- 9612.10.90.10 Woven, of man-made fibers (621) (doz., kg).
- 9612.10.90.30 Thermal transfer printing ribbons of coated polyethylene terephthalate film (doz., kg).
- 9612.10.90.90 Other (under: Other) (doz., kg).
- 9612.20.00.00 Ink pads (under: Typewriter or similar ribbons, inked or otherwise prepared for giving impressions, whether or not on spools or in cartridges; ink pads, whether or not inked, with or without boxes) (No.): General 3.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.