HTS Heading 9613

Cigarette lighters and other lighters, whether or not mechanical or electrical, and parts thereof other than flints and wicks

All 11 HTS codes under heading 9613 (cigarette lighters and other lighters), with their duty rates from the 2026 HTS Revision 23. General duty 3.6% to 9%.

Every line of heading 9613

  • 9613 Cigarette lighters and other lighters, whether or not mechanical or electrical, and parts thereof other than flints and wicks.
  • 9613.10.00.00 Pocket lighters, gas fueled, non-refillable (No.): General 4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
  • 9613.20.00.00 Pocket lighters, gas fueled, refillable (No.): General 9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
  • 9613.80 Other lighters (under: Cigarette lighters and other lighters, whether or not mechanical or electrical, and parts thereof other than flints and wicks).
  • 9613.80.10 Table lighters (under: Other lighters): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 9613.80.10.40 Butane (under: Table lighters) (No.).
  • 9613.80.10.80 Other (under: Table lighters) (No.).
  • 9613.80.20 Electrical (under: Other): General 3.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 9613.80.20.10 Multipurpose lighters, including those used to light charcoal and gas grills and fireplaces (No.).
  • 9613.80.20.90 Other (under: Electrical) (No.).
  • 9613.80.40.00 Of precious metal (except silver), of precious or semiprecious stones or of such metal and such stones (No.): General 3.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 9613.80.60.00 Valued not over $5 per dozen pieces (doz.): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
  • 9613.80.80.00 Valued over $5 per dozen pieces (doz.): General 9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.
  • 9613.90 Parts (under: Cigarette lighters and other lighters, whether or not mechanical or electrical, and parts thereof other than flints and wicks).
  • 9613.90.40.00 Electrical (under: Parts) (No.): General 3.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 9613.90.80.00 Other (under: Parts) (No.): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 110%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.