HTS Heading 9618
Tailors' dummies and other mannequins; automatons and other animated displays used for shopwindow dressing
The HTS code under heading 9618 (tailors' dummies and other mannequins), with its duty rates from the 2026 HTS Revision 23. General duty 4.4%.
Every line of heading 9618
- 9618.00.00.00 Tailors' dummies and other mannequins; automatons and other animated displays used for shopwindow dressing (No.): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 56%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.