HTS Heading 9617
Vacuum flasks and other vacuum vessels, complete; parts thereof other than glass inners
All 4 HTS codes under heading 9617 (vacuum flasks and other vacuum vessels), with their duty rates from the 2026 HTS Revision 23. General duty 6.9% to 7.2%.
Every line of heading 9617
- 9617.00 Vacuum flasks and other vacuum vessels, complete; parts thereof other than glass inners.
- 9617.00.10.00 Having a capacity not exceeding 1 liter (No.): General 7.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55.5%.
- 9617.00.30.00 Having a capacity exceeding 1 liter but not exceeding 2 liters (No.): General 6.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52%.
- 9617.00.40.00 Having a capacity exceeding 2 liters (No.): General 6.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 51%.
- 9617.00.60.00 Parts (under: Vacuum flasks and other vacuum vessels, complete; parts thereof other than glass inners) (No.): General 7.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.