HTS Heading 9620
Monopods, bipods, tripods and similar articles
All 16 HTS codes under heading 9620 (monopods, bipods), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.8%.
Every line of heading 9620
- 9620.00 Monopods, bipods, tripods and similar articles.
- 9620.00.10.00 Accessories suitable for use solely or principally with the apparatus of heading 8519 or 8521 (No.): General 2%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 9620.00.15.00 Accessories for the articles of heading 9005 (No.): General The rate applicable to the article of which it is an accessory; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to the article of which it is an accessory.
- 9620.00.20.00 Accessories for photographic (other than cinematographic) cameras of heading 9006 (No.): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 9620.00.25.00 Accessories for cinematographic cameras of heading 9007 (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9620.00.30 Accessories for the instruments and appliances, including rangefinders, of heading 9015: General The rate applicable to the article of which it is an accessory; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to the article of which it is an accessory.
- 9620.00.30.10 Of rangefinders (under: Accessories for the instruments and appliances, including rangefinders, of heading 9015) (No.).
- 9620.00.30.20 Of theodolites and tachymeters (No.).
- 9620.00.30.30 Of levels (under: Accessories for the instruments and appliances, including rangefinders, of heading 9015) (No.).
- 9620.00.30.40 Of photogrammetrical surveying instruments and apparatus (No.).
- 9620.00.30.50 Of seismographs (under: Accessories for the instruments and appliances, including rangefinders, of heading 9015) (No.).
- 9620.00.30.60 Of other geophysical instruments and apparatus (No.).
- 9620.00.30.90 Other (under: Accessories for the instruments and appliances, including rangefinders, of heading 9015) (No.).
- 9620.00.50.00 Of plastics (under: Other) (No.): General 5.3%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 9620.00.55.00 Of wood (under: Other) (No.): General 3.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
- 9620.00.60.00 Of graphite or other carbon (under: Other) (No.): General Free; Special none; Column 2 45%.
- 9620.00.65.00 Of iron or steel (under: Other) (No.): General 2.9%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 9620.00.70.00 Of aluminum (under: Other) (No.): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.