HTS Heading 9701

Painting, drawings and pastels, executed entirely by hand, other than drawings of heading 4906 and other than hand-painted or hand-decorated manufacture articles; collages, mosaics and similar decorative plaques

All 6 HTS codes under heading 9701 (painting, drawings and pastels), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 9701

  • 9701 Painting, drawings and pastels, executed entirely by hand, other than drawings of heading 4906 and other than hand-painted or hand-decorated manufacture articles; collages, mosaics and similar decorative plaques.
  • 9701.21.00.00 Paintings, drawings, and pastels (No.): General Free; Special none; Column 2 Free.
  • 9701.22.00.00 Mosaics (under: Of an age exceeding 100 years) (No.): General Free; Special none; Column 2 Free.
  • 9701.29.00.00 Other (under: Of an age exceeding 100 years) (No.): General Free; Special none; Column 2 Free.
  • 9701.91.00.00 Paintings, drawings, and pastels (No.): General Free; Special none; Column 2 Free.
  • 9701.92.00.00 Mosaics (under: Other) (No.): General Free; Special none; Column 2 Free.
  • 9701.99.00.00 Other (under: Other) (No.): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.