HTS Heading 9703
Original sculptures and statuary, in any material
All 2 HTS codes under heading 9703 (original sculptures and statuary, in any material), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9703
- 9703 Original sculptures and statuary, in any material.
- 9703.10.00.00 Of an age exceeding 100 years (No.): General Free; Special none; Column 2 Free.
- 9703.90.00.00 Other (under: Original sculptures and statuary, in any material) (No.): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.