HTS Heading 9702

Original engravings, prints and lithographs

All 2 HTS codes under heading 9702 (original engravings, prints and lithographs), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 9702

  • 9702 Original engravings, prints and lithographs.
  • 9702.10.00.00 Of an age exceeding 100 years (No.): General Free; Special none; Column 2 Free.
  • 9702.90.00.00 Other (under: Original engravings, prints and lithographs) (No.): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.