HTS Chapter 97
Works of art, collectors' pieces and antiques
The 6 headings and 30 HTS codes of chapter 97 (works of art, collectors' pieces and antiques), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 97
- 9701: Painting, drawings and pastels, executed entirely by hand, other than drawings of heading 4906 and other than hand-painted or hand-decorated manufacture articles; collages, mosaics and similar decorative plaques (6 codes, General duty Free)
- 9702: Original engravings, prints and lithographs (2 codes, General duty Free)
- 9703: Original sculptures and statuary, in any material (2 codes, General duty Free)
- 9704: Postage or revenue stamps, stamp-postmarks, first-day covers, postal stationery (stamped paper) and the like, used or unused, other than those of heading 4907 (1 code, General duty Free)
- 9705: Collections and collectors’ pieces of archaeological, ethnographic, historical, zoological, botanical, mineralogical, anatomical, paleontological or numismatic interest (13 codes, General duty Free)
- 9706: Antiques of an age exceeding 100 years (6 codes, General duty Free)
Where it sits in the schedule
Chapter 97 is in Section XXI of the Harmonized System, works of art and antiques (chapters 97 to 97). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.