HTS Heading 9705

Collections and collectors’ pieces of archaeological, ethnographic, historical, zoological, botanical, mineralogical, anatomical, paleontological or numismatic interest

All 13 HTS codes under heading 9705 (collections), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 9705

  • 9705 Collections and collectors’ pieces of archaeological, ethnographic, historical, zoological, botanical, mineralogical, anatomical, paleontological or numismatic interest.
  • 9705.10.00 Collections and collectors’ pieces of archaeological, ethnographic or historical interest: General Free; Special none; Column 2 Free.
  • 9705.10.00.10 Archaeological pieces of a kind described in statistical note 1 to this chapter (kg).
  • 9705.10.00.20 Ethnographic pieces of a kind described in statistical note 1 to this chapter (kg).
  • 9705.10.00.90 Other (under: Collections and collectors’ pieces of archaeological, ethnographic or historical interest) (kg).
  • 9705.21.00.00 Human specimens and parts thereof (g): General Free; Special none; Column 2 Free.
  • 9705.22.00.00 Extinct or endangered species and parts thereof (g): General Free; Special none; Column 2 Free.
  • 9705.29.00.00 Other (under: Collections and collectors’ pieces of zoological, botanical, mineralogical, anatomical or paleontological interest) (g): General Free; Special none; Column 2 Free.
  • 9705.31.00 Of an age exceeding 100 years: General Free; Special none; Column 2 Free.
  • 9705.31.00.01 Coins made prior to the 14th century and not known to be the direct products of excavations, finds or archaeological sites (g).
  • 9705.31.00.10 Gold (under: Of an age equal to or exceeding 250 years) (g).
  • 9705.31.00.40 Other (under: Of an age equal to or exceeding 250 years) (g).
  • 9705.31.00.50 Gold (under: Of an age exceeding 100 years but less than 250 years) (g).
  • 9705.31.00.65 Other (under: Of an age exceeding 100 years but less than 250 years) (g).
  • 9705.39.00 Other (under: Collections and collectors’ pieces of numismatic interest): General Free; Special none; Column 2 Free.
  • 9705.39.00.10 Gold (under: Other) (g).
  • 9705.39.00.40 Other (under: Other) (g).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.