HTS Heading 9706
Antiques of an age exceeding 100 years
All 6 HTS codes under heading 9706 (antiques of an age exceeding 100 years), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 9706
- 9706 Antiques of an age exceeding 100 years.
- 9706.10.00 Of an age exceeding 250 years: General Free; Special none; Column 2 Free.
- 9706.10.00.20 Silverware (under: Of an age exceeding 250 years) (kg).
- 9706.10.00.40 Furniture (under: Of an age exceeding 250 years) (kg).
- 9706.10.00.60 Other (under: Of an age exceeding 250 years) (kg).
- 9706.90.00 Other (under: Antiques of an age exceeding 100 years): General Free; Special none; Column 2 Free.
- 9706.90.00.20 Silverware (under: Other) (kg).
- 9706.90.00.40 Furniture (under: Other) (kg).
- 9706.90.00.60 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.