Aerospace and Defense Manufacturing KPIs: Buy-to-Fly, Yield, Escapes and Delivery

The KPIs that matter in aerospace and defense manufacturing, what prime supplier scorecards actually require, how to measure each KPI, and the levers that move it.

† marks a figure with no cited source: it is kept as originally published and is illustrative. How the figures are sourced

Aerospace and defense primes score their suppliers on a short list of numbers. Use the ranges below as a reference point for finding your biggest gap, not as targets, and trust your own trend over any single industry figure.

Every figure here shows its basis. A superscript number links to a public source in the Sources list at the end, including published prime scorecards and supplier requirements, and the sentence states that source's year and scope. A figure marked no cited source is kept exactly as originally published because no public source stating it has been found, so treat it as illustrative.

At a glance

Aerospace and defense manufacturing KPI benchmarks at a glance
KPITypicalStrongBasis
Buy-to-fly, machined aluminum aerostructures3:1 to 8:1Not stated†
Buy-to-fly, titanium forgings and hogouts10:1 to 20:13:1 or better with near-net routes (world-class)NASA, Rolls-Royce, ORNL1, 2, 3
First pass yield, machined details90 to 94%97 to 99% (world-class flight hardware); space programs chase > 99%†
Rework rate4 to 7%< 2% (world-class)†
Cpk on key characteristicsNot stated1.33 or better (customer minimum)RTX, AM General4, 5
Inspection burden15 to 25%8 to 12% (efficient shops)†
Supplier escapes, high volume2,000 to 10,000 PPM (developing supplier)< 100 PPM (RTX Performing)RTX rating6; developing supplier†
On-time delivery95% (scorecard demand)98 to 99% (world-class)RTX, Lockheed Martin6, 7
NCR disposition cycle time10 to 20 days< 5 working days (world-class)†
First article report rejections20 to 35%Fewer than one in ten (world-class)†
AS9100 finding closureNot stated< 30 days, zero majors†
Planned rework hours, share of technician capacityNot statedKeep under 10 to 15%†
Certified material lead time6 to 12 weeks (specialty titanium or DFARS melt)< 10 days (world-class, standard alloys)†
Ranges are as originally published unless a source is cited. Labels such as world-class in a cell are the original's own words. PPM means defective parts per million shipped, and Not stated means the original gave no figure for that column.

Method: How the figures in this guide are sourced

A figure with a superscript number is stated by the cited source, listed under Sources with its publisher, date and access date. Scorecard thresholds belong to the named prime and may differ at yours. A figure marked no cited source is kept exactly as originally published because no public source stating it has been found. It is illustrative, not measured industry data.

Buy-to-fly ratio

Buy-to-fly ratio, the weight of material bought divided by the weight of the finished part, is the material efficiency KPI that separates strong shops from wasteful ones. Typical 5-axis machined aluminum aerostructures run 3:1 to 8:1†, while titanium forgings and hogouts drift into 10:1 to 20:11, 2, 3.

Published titanium and aero engine buy-to-fly figures
SourceScopeRatioBasis
NASA Langley, 2011Conventional titanium processing, typical average15:11
NASA Langley, 2011Large structural titanium forgings> 10:11
Rolls-Royce, 2006Typical range on aero engine components6:1 to 25:12
Oak Ridge National Laboratory, 2013Titanium engine components and older platforms, average8:13
Oak Ridge National Laboratory, 2013Titanium parts on new jets such as the Boeing 787, F-35 and F-22, average11:13

World-class programs pull the ratio down by moving from plate hogouts toward near-net forgings, castings, or additive preforms, which can cut a 12:1 machined ratio to 3:1 or better3. For titanium, Oak Ridge reported in 2013 that near-net powder and additive routes let aerospace makers decrease buy-to-fly from over 10 to 1 to less than 1.5 to 1 on some lower yield parts3.

Track it per part number and flag anything above 10:1 as a candidate for near-net redesign†. Each point of ratio reduction directly returns raw metal spend, often the largest cost on the part.

How to measure

  • Divide the weight of stock bought by the weight of the finished part, per part number.
  • Use the stock actually ordered, not the nominal part envelope.
  • Recompute the ratio whenever the stock form or the supplier changes.

What moves it

  • Near-net forgings or castings in place of plate hogouts.
  • Additive preforms for high-removal titanium parts.
  • Redesign of the part numbers flagged as high-ratio candidates.

Run your own parts through the Buy-to-Fly Ratio calculator.

First pass yield and rework rate

First pass yield and its cousin, rework rate, define your conformance floor. Typical aerospace machined-detail first pass yield sits around 90 to 94 percent†; world-class flight-hardware lines hold 97 to 99 percent†. Space hardware programs chase yields above 99 percent because a single escape can be a mission†. For rework rate, world-class is under 2 percent versus a typical 4 to 7 percent†.

The main lever is process capability on key characteristics. RTX's 2025 aerospace supplier quality requirements (ASQR-01) set a minimum Cpk/Ppk of 1.33 on key characteristics4, and AM General's 2023 supplier quality manual requires a Cpk of 1.33 or better on major characteristics5.

Pair capability with tool-life monitoring and first-part probing. Measure yield at the operation level, not just final, so you can see where units actually fall out.

How to measure

  • Divide units that pass an operation without rework or scrap by units started at that operation.
  • Roll operation yields up to a part-level figure, and keep both views.
  • Report rework rate as reworked units over units produced in the same period.

What moves it

  • Process capability on key characteristics, targeted at a Cpk of 1.33 or better4.
  • Tool-life monitoring.
  • First-part probing in the machine.

Low yield tends to show up as extra inspection; size that load with the Aerospace Inspection Burden calculator.

Inspection burden

Inspection burden, inspection hours as a share of labor hours, is a KPI you want low without starving quality. Typical aerospace shops run 15 to 25 percent inspection burden†. Efficient shops using in-process probing, statistical sampling per AS9138, and reduced-inspection agreements push toward 8 to 12 percent while holding escape rate flat†.

The improvement lever is not cutting inspection blindly; it is earning inspection reduction through demonstrated capability and moving checks upstream into the machine. A shop stuck at 30 percent burden usually has an unstable process it is inspecting its way around, which is far more expensive than fixing the process†.

How to measure

  • Divide inspection hours by total labor hours for the same period.
  • Include operator in-process checks as well as final inspection.
  • Track escape rate alongside, so a lower burden is not bought with escapes.

What moves it

  • In-process probing that moves checks into the machine.
  • Statistical sampling under AS9138 where capability is demonstrated.
  • Reduced-inspection agreements earned with capability data.

Model your own hours with the Aerospace Inspection Burden calculator.

Supplier escape rate

Supplier escape rate is the KPI primes watch most closely, expressed in defective parts per million (PPM) shipped. RTX's Supplier Rating System, applied across RTX businesses over a rolling 12 months, rates a high-volume supplier Performing below 100 PPM, Progressing at 250 PPM or less, and Underperforming above 250 PPM6.

Suppliers shipping fewer than 100,000 pieces in 12 months are rated on escapes counted instead: one or fewer rates Performing, six or fewer Progressing, and more than six Underperforming6. A typical developing supplier runs 2,000 to 10,000 PPM†.

Because one escape to a prime can cost 5,000 to 50,000 dollars in containment and corrective action, this KPI ties directly to whether you keep the contract†. Track escape trends monthly rather than reacting to single events.

How to measure

  • Divide defective parts found by the customer by parts shipped, then multiply by one million.
  • Use a rolling 12 month window, as the RTX rating does6.
  • Below 100,000 pieces in 12 months, count escapes rather than PPM6.

What moves it

  • Layered process audits.
  • Error-proofing at final inspection.
  • Closed-loop corrective action on every escape.

Put a dollar figure on each escape with the Supplier Escape Cost calculator.

On-time delivery and NCR cycle time

On-time delivery (OTD) and nonconformance report (NCR) cycle time govern your standing on the scorecard. Prime supplier scorecards typically demand 95 percent OTD6, 7, and world-class suppliers sustain 98 to 99 percent7.

Anything under 90 percent rates Underperforming at RTX and Unsatisfactory at Lockheed Martin6, 7. RTX counts a lot as on time from three days late to 30 days early (business days) against the statistical date, so compare OTD figures only when the window is stated6.

Delivery rating bands on two prime supplier scorecards
On-time deliveryRTX ratingLockheed Martin ratingBasis
98 to 100%PerformingExcellent6, 7
95 to 97.99%PerformingApproved6, 7
90 to 94.99%ProgressingConditional6, 7
< 90%UnderperformingUnsatisfactory6, 7
RTX rates on a rolling 12 months6. The Lockheed Martin bands are from its scorecard revised in April 20217.

Nonconformance disposition cycle time is the days from NCR open to material review board (MRB) close. It should target under 5 working days world-class versus a typical 10 to 20 days†, because parked material both blocks delivery and ties up cash.

How to measure

  • Measure OTD against the customer's commit date, with the on-time window written down.
  • Measure NCR cycle time in working days from open to MRB close.
  • Age the open NCR queue so old dispositions stand out.

What moves it

  • Disposition staffing sized to the engineer hours the NCR queue needs.
  • A standing MRB cadence rather than meetings called when the queue is already full.

The aerospace, defense and space calculators help size the inspection, audit and certification hours that sit behind delivery.

First article and audit performance

First article and audit performance are lagging indicators of program health. World-class first article inspection (FAI) approval is first-time-right above 90 percent, meaning fewer than one in ten AS9102 packages bounces back†. Typical shops see 20 to 35 percent first article inspection report (FAIR) rejections driven by ballooning errors and missing form data†.

On the audit side, aim to close AS9100 surveillance findings in under 30 days with zero majors per cycle†; multiple majors signals a system, not a part, problem. For comparison, one certification body, TUV Rheinland of North America, gives a client up to 60 days from the audit date to submit root cause and proposed corrective action for each nonconformity8. That is a deadline, not a target.

How to measure

  • Divide FAIR packages accepted on first submission by packages submitted.
  • Log each rejection by cause, such as ballooning errors or missing form data.
  • Measure audit finding closure in days from the audit date.

What moves it

  • A ballooning check before a FAIR package leaves the shop.
  • Complete AS9102 form data on every package.
  • System-level corrective action when major findings repeat.

Plan the hours with the AS9100 Audit Load calculator, so audits and first articles do not become fire drills before a customer visit.

Rework capacity and material certificate lead time

Rework capacity utilization and material certificate lead time are the operational KPIs that quietly wreck schedules. Keep planned rework hours under 10 to 15 percent of skilled-technician capacity so a defect spike has headroom†. A shop already at 80 percent rework utilization has no shock absorber†.

Material certificate lead time is the days from order to certified stock in hand. World-class is under 10 days for standard alloys versus 6 to 12 weeks for specialty titanium or melt compliant with the Defense Federal Acquisition Regulation Supplement (DFARS)†.

Track it per alloy and hold safety stock on long-lead material. Certification delay, not machining, is the hidden pacing item on most aerospace jobs.

How to measure

  • Divide planned rework hours by skilled-technician hours available each week.
  • Measure certificate lead time per alloy, from purchase order to certified stock on the shelf.

What moves it

  • Safety stock on long-lead alloys.
  • Technician capacity held free for defect spikes.

Estimate what certification adds to each order with the Material Certification Cost calculator.

How to build your own baseline

  • Pick one KPI, write its definition down, and keep it fixed.
  • Use the windows your customers use, such as a rolling 12 months for escapes and delivery6.
  • Measure at the operation, part number and alloy level before rolling up.
  • Compare against your customers' scorecard bands first and published ranges second.
  • Record what changed in the process whenever a KPI moves.

Sources

  1. Net Shape Processing of Titanium Alloys for Enhanced Performance and Improved Affordability (12th World Conference on Titanium). NASA Langley Research Center (C. A. Brice), NASA Technical Reports Server 20200005561. published June 22, 2011. PDF p. 4 (conventional titanium processing) and PDF p. 6 (forging). Accessed September 30, 2026.
  2. An Investigation into the Comparative Costs of Additive Manufacture vs. Machine from Solid for Aero Engine Parts. J. Allen, Rolls-Royce plc; NATO Research and Technology Organisation, RTO-MP-AVT-139 paper 17. published 2006. Abstract; Section 2, discussion of Fig. 3 (PDF p. 6). Accessed September 30, 2026.
  3. Near Net Shape Manufacturing of New, Low Cost Titanium Powders for Industry (ORNL/TM-2012/510). Oak Ridge National Laboratory (W. H. Peter, Y. Yamamoto), U.S. Department of Energy. published March 5, 2013. Introduction, PDF pp. 21, 23 and 24. Accessed September 30, 2026.
  4. Aerospace Supplier Quality Requirements (ASQR-01), Revision 15. RTX Corporation (Pratt & Whitney, Collins Aerospace). published May 22, 2025. PPAP process capability section, Table IV and following paragraph (PDF p. 18). Accessed September 30, 2026.
  5. Supplier Quality Manual. AM General LLC. published February 2023. Section 3.3.11.4, Requirements for process capability indices. Accessed September 30, 2026.
  6. Supplier Rating System User Guide. RTX Corporation (Raytheon Supplier Rating System). published 2026. p. 8, 'RTX performance criteria' table; p. 7 quality rating; p. 16 on-time window. Accessed September 30, 2026.
  7. Lockheed Martin's Supplier Scorecard. Lockheed Martin Corporation. published April 2021. 'Delivery Rating Scale' panel. Accessed September 30, 2026.
  8. General Conditions and Procedural Guidelines for the Certification of Aerospace Quality Management Systems Based Upon the Requirements of AS9100 or AS9120 (MS-0005710, Version 3.2). TUV Rheinland of North America, Inc. (certification body). Section 3.3.4.7.1, Nonconformity Report (PDF p. 7). Accessed September 30, 2026.

Published 2026-07-01.