Market Wire
Manufacturing in Alaska Runs 38% Above the National Cost Average in August 2026
Alaska's manufacturing cost index stands at 138.4 against a national 100 as of August 2026: labor at 128.4 and industrial energy at 253.4. That places it 50th cheapest of 51 jurisdictions, the 50 states and DC. Labor uses 2025 wages; energy averages industrial electricity prices from September 2025 to August 2026.
- composite (US = 100): 138.4
- labor: 128.4
- industrial energy: 253.4
The composite weights labor at 92% and industrial electricity at 8%, so Alaska's position is mostly a labor story: its labor component indexes at 128.4 against the national 100. A premium of 38 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.
For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.
Published 2026-11-24.