Forecast Signal
10-Year High-Quality Corporate Bond Rate (Treasury Hqm): Six-Month Forecast
5.99% projected by Apr 2027 (−0.5% from 6.02% in Oct 2026), 80% target band 5.32% to 6.66%. A six-month statistical projection for 10-year high-quality corporate bond rate (treasury hqm), shown with its target band and one-step backtest error.
The six-month projection
- Projected for Apr 2027: 5.99%, −0.5% versus 6.02% in Oct 2026.
- Band at the six-month horizon: 80% target band 5.32% to 6.66%.
- Direction: Holds flat. The −0.5% move sits inside the 80% target band, so the model cannot call its direction.
- One-step backtest error (MAPE): 6.8% over 2 points, one step ahead on months the model had not seen.
Statistical extrapolation, not a market or policy forecast
- It knows nothing about the next Fed decision, OPEC action, or policy change. Read the target band and the backtest error, not just the central line.
- So far 68.2% of 1,023 stored predictions graded against later prints landed inside their 80% target band. No prediction 6 months ahead has been graded yet.
- This series publishes monthly, so the model forecasts directly on it and is anchored on October 2026, the newest month the source has released. Any gap to today is the agency's publication lag, not a stale model.
How it is built
- The series is collapsed to one point per month, then projected six months with Holt linear exponential smoothing with an undamped trend and no seasonal pattern. The smoothing parameters are grid-searched by walk-forward validation on an early tuning segment, and the reported error is the mean absolute percentage error over the 2 one-step-ahead predictions in a final evaluation segment never used for selection or band calibration. Deterministic: the same data always yields the same forecast.
- The 80% band is a labelled Gaussian fallback, used because the history is too short to calibrate an empirical residual band.
Source
- Source: U.S. Treasury via FRED. Underlying series is U.S. government open data, public domain.
Last reviewed 2026-11-25.