Forecast Signal

PPI: Carbon Steel Scrap: Six-Month Forecast

572.00 projected by Apr 2027 (+4.5% from 547.40 in Oct 2026), 80% target band 515.32 to 628.69. A six-month statistical projection for ppi: carbon steel scrap, shown with its target band and one-step backtest error.

The six-month projection

  • Projected for Apr 2027: 572.00, +4.5% versus 547.40 in Oct 2026.
  • Band at the six-month horizon: 80% target band 515.32 to 628.69.
  • Direction: Within error. The +4.5% move sits inside the 80% target band, so the model cannot call its direction.
  • One-step backtest error (MAPE): 6.4% over 6 points, one step ahead on months the model had not seen.

Statistical extrapolation, not a market or policy forecast

  • It knows nothing about the next Fed decision, OPEC action, or policy change. Read the target band and the backtest error, not just the central line.
  • So far 68.2% of 1,023 stored predictions graded against later prints landed inside their 80% target band. No prediction 6 months ahead has been graded yet.
  • This series publishes monthly, so the model forecasts directly on it and is anchored on October 2026, the newest month the source has released. Any gap to today is the agency's publication lag, not a stale model.

How it is built

  • The series is collapsed to one point per month, then projected six months with Holt-Winters seasonal exponential smoothing with a damped trend and a twelve-month seasonal pattern. The smoothing parameters are grid-searched by walk-forward validation on an early tuning segment, and the reported error is the mean absolute percentage error over the 6 one-step-ahead predictions in a final evaluation segment never used for selection or band calibration. Deterministic: the same data always yields the same forecast.
  • The 80% band is an empirical residual band: at each horizon its width is the 80% quantile of this series' own fixed-parameter walk-forward residuals (13 residuals at the six-month horizon).

Source

  • Source: BLS Producer Price Index. Underlying series is U.S. government open data, public domain.

Last reviewed 2026-11-25.