Forecast Signal

Taiwan Dollar: Six-Month Forecast

34.3192 projected by Apr 2027 (+6.4% from 32.2695 in Oct 2026), 80% target band 32.6984 to 35.9400. A six-month statistical projection for taiwan dollar, shown with its target band and one-step backtest error.

The six-month projection

  • Projected for Apr 2027: 34.3192, +6.4% versus 32.2695 in Oct 2026.
  • Band at the six-month horizon: 80% target band 32.6984 to 35.9400.
  • Direction: Rising, from 32.2695 in Oct 2026.
  • One-step backtest error (MAPE): 3.2% over 2 points, one step ahead on months the model had not seen.

Statistical extrapolation, not a market or policy forecast

  • It knows nothing about the next Fed decision, OPEC action, or policy change. Read the target band and the backtest error, not just the central line.
  • So far 68.2% of 1,023 stored predictions graded against later prints landed inside their 80% target band. No prediction 6 months ahead has been graded yet.
  • This series publishes daily. The model averages those daily readings into one point per calendar month and forecasts monthly, so it is anchored on October 2026, the most recent COMPLETE month. The newest daily reading, 32.9700 on Nov 20, 2026, is not in the anchor yet: it belongs to a month that is still filling, and joins the model once that month closes.

How it is built

  • The series is collapsed to one point per month, then projected six months with Holt linear exponential smoothing with an undamped trend and no seasonal pattern. The smoothing parameters are grid-searched by walk-forward validation on an early tuning segment, and the reported error is the mean absolute percentage error over the 2 one-step-ahead predictions in a final evaluation segment never used for selection or band calibration. Deterministic: the same data always yields the same forecast.
  • The 80% band is a labelled Gaussian fallback, used because the history is too short to calibrate an empirical residual band.

Source

  • Source: Federal Reserve H.10 via FRED. Underlying series is U.S. government open data, public domain.

Last reviewed 2026-11-25.