Tariff Monitor

Tariffs on Imports From Belarus

In 2025, U.S. importers brought in $786K of goods from Belarus across 14 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 41.57%, up from 24.27% the year before. Belarus's largest tracked categories: aluminum semi-finished products, measuring and inspection instruments, rubber materials and products. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Belarus: $786K in 2025 across 14 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 41.57% (24.27% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from Belarus

  • Aluminum semi-finished products
  • Measuring and inspection instruments
  • Rubber materials and products
  • Batteries and storage cells
  • Insulated wire and cable

Frequently asked questions

  • How much does the U.S. import from Belarus? U.S. imports from Belarus totaled $786K in customs value in 2025, across the 14 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Belarus? In 2025, imports from Belarus had an effective calculated-duty rate of 41.57% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 24.27%.
  • What does the U.S. import most from Belarus? Among tracked manufacturing families, Belarus's largest recent categories are aluminum semi-finished products, measuring and inspection instruments, rubber materials and products, batteries and storage cells. Each has its own live rate page linked below.
  • Is the tariff burden on Belarus rising or falling? Rising: the effective rate on tracked imports from Belarus moved +17.3 points year over year to 41.57% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.