Tariff Monitor
U.S. Imports of Compressors and fans From China
In 2025, U.S. importers brought in $3.0B of compressors and fans from China; the reported effective calculated-duty rate was 35.66% for that flow. That makes China the 2nd-largest named source of this family, at 20.2% of tracked compressors and fans imports. The family-wide effective calculated-duty rate is 14.68%, so China's observed rate is 21 points more than average. Freight and insurance add 6.54% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $3.0B of compressors and fans from China in 2025, customs value.
- Observed effective calculated-duty rate: 35.66%, reported Calculated Duties ÷ covered customs value, 21 points above the 14.68% family average.
- Share of the family: 20.2%, #2 named source of compressors and fans.
- Reported freight and insurance: 6.54% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 3 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on compressors and fans from China? In 2025, the reported effective calculated-duty rate was 35.66% for compressors and fans imported from China, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much compressors and fans does the U.S. import from China? The U.S. imported $3.0B of compressors and fans from China in 2025, 20.2% of the tracked compressors and fans it imports, ranking China the 2nd-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on compressors and fans from China? Cost, insurance, and freight ran 6.54% of customs value on compressors and fans from China in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.