Tariff Monitor
U.S. Imports of Plastic semi-finished products From China
In 2025, U.S. importers brought in $983.5M of plastic semi-finished products from China; the reported effective calculated-duty rate was 47.42% for that flow. That makes China the 3rd-largest named source of this family, at 7.5% of tracked plastic semi-finished products imports. The family-wide effective calculated-duty rate is 9.84%, so China's observed rate is 37.6 points more than average. Freight and insurance add 9.85% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $983.5M of plastic semi-finished products from China in 2025, customs value.
- Observed effective calculated-duty rate: 47.42%, reported Calculated Duties ÷ covered customs value, 37.6 points above the 9.84% family average.
- Share of the family: 7.5%, #3 named source of plastic semi-finished products.
- Reported freight and insurance: 9.85% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 12 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on plastic semi-finished products from China? In 2025, the reported effective calculated-duty rate was 47.42% for plastic semi-finished products imported from China, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much plastic semi-finished products does the U.S. import from China? The U.S. imported $983.5M of plastic semi-finished products from China in 2025, 7.5% of the tracked plastic semi-finished products it imports, ranking China the 3rd-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on plastic semi-finished products from China? Cost, insurance, and freight ran 9.85% of customs value on plastic semi-finished products from China in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.