Tariff Monitor
U.S. Imports of Switchgear, connectors, and controls From Dominican Republic
In 2025, U.S. importers brought in $842.4M of switchgear, connectors, and controls from Dominican Republic; the reported effective calculated-duty rate was 6.26% for that flow. That makes Dominican Republic the 14th-largest named source of this family, at 2% of tracked switchgear, connectors, and controls imports. The family-wide effective calculated-duty rate is 11.21%, so Dominican Republic's observed rate is 5 points less than average. Freight and insurance add 0.75% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $842.4M of switchgear, connectors, and controls from Dominican Republic in 2025, customs value.
- Observed effective calculated-duty rate: 6.26%, reported Calculated Duties ÷ covered customs value, 5 points below the 11.21% family average.
- Share of the family: 2%, #14 named source of switchgear, connectors, and controls.
- Reported freight and insurance: 0.75% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 6 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on switchgear, connectors, and controls from Dominican Republic? In 2025, the reported effective calculated-duty rate was 6.26% for switchgear, connectors, and controls imported from Dominican Republic, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much switchgear, connectors, and controls does the U.S. import from Dominican Republic? The U.S. imported $842.4M of switchgear, connectors, and controls from Dominican Republic in 2025, 2% of the tracked switchgear, connectors, and controls it imports, ranking Dominican Republic the 14th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on switchgear, connectors, and controls from Dominican Republic? Cost, insurance, and freight ran 0.75% of customs value on switchgear, connectors, and controls from Dominican Republic in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.