Tariff Monitor

Tariffs on Imports From Egypt

In 2025, U.S. importers brought in $342.9M of goods from Egypt across 40 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 19.99%, up from 11.58% the year before. Egypt's largest tracked categories: steel bar, rod, and wire, plastic semi-finished products, glass fiber and reinforcements. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from Egypt: $342.9M in 2025 across 40 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 19.99% (11.58% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 4 years of annual named-source boards.

Largest tracked families from Egypt

  • Steel bar, rod, and wire
  • Plastic semi-finished products
  • Glass fiber and reinforcements
  • Insulated wire and cable
  • Steel flat-rolled products

Frequently asked questions

  • How much does the U.S. import from Egypt? U.S. imports from Egypt totaled $342.9M in customs value in 2025, across the 40 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from Egypt? In 2025, imports from Egypt had an effective calculated-duty rate of 19.99% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 11.58%.
  • What does the U.S. import most from Egypt? Among tracked manufacturing families, Egypt's largest recent categories are steel bar, rod, and wire, plastic semi-finished products, glass fiber and reinforcements, insulated wire and cable. Each has its own live rate page linked below.
  • Is the tariff burden on Egypt rising or falling? Rising: the effective rate on tracked imports from Egypt moved +8.4 points year over year to 19.99% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.