Tariff Monitor

Tariffs on Imports From French Polynesia

In 2025, U.S. importers brought in $232K of goods from French Polynesia across 15 manufacturing families MFG Calcs tracks, carrying an effective calculated-duty rate of 5.37%, up from 0.2% the year before. French Polynesia's largest tracked categories: turbines and fluid-power drives, switchgear, connectors, and controls, transformers and power supplies. Tracked-family totals are a floor on total bilateral trade, from USITC DataWeb data.

The current reading

  • Tracked imports from French Polynesia: $232K in 2025 across 15 manufacturing families, a floor on total bilateral trade.
  • Observed effective calculated-duty rate: 5.37% (0.2% the year before), reported Calculated Duties ÷ covered customs value.
  • History depth: 2 years of annual named-source boards.

Largest tracked families from French Polynesia

  • Turbines and fluid-power drives
  • Switchgear, connectors, and controls
  • Transformers and power supplies
  • Semiconductors and integrated circuits
  • Measuring and inspection instruments

Frequently asked questions

  • How much does the U.S. import from French Polynesia? U.S. imports from French Polynesia totaled $232K in customs value in 2025, across the 15 manufacturing material and equipment families MFG Calcs tracks. That is a floor on total bilateral trade. It excludes manufacturing products outside the tracked family universe.
  • What effective calculated-duty rate is observed for imports from French Polynesia? In 2025, imports from French Polynesia had an effective calculated-duty rate of 5.37% across tracked families. The rate is reported Calculated Duties divided by the customs value covered by those duty observations, which reflects the combined product, origin, preference and tariff mix in USITC's statistics. A year earlier the rate was 0.2%.
  • What does the U.S. import most from French Polynesia? Among tracked manufacturing families, French Polynesia's largest recent categories are turbines and fluid-power drives, switchgear, connectors, and controls, transformers and power supplies, semiconductors and integrated circuits. Each has its own live rate page linked below.
  • Is the tariff burden on French Polynesia rising or falling? Rising: the effective rate on tracked imports from French Polynesia moved +5.2 points year over year to 5.37% in 2025. Monthly family-level detail is on each linked family page.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.