Tariff Monitor

U.S. Imports of Fabricated structural steel From Germany

In 2025, U.S. importers brought in $497.6M of fabricated structural steel from Germany; the reported effective calculated-duty rate was 27.27% for that flow. That makes Germany the 5th-largest named source of this family, at 7% of tracked fabricated structural steel imports. The family-wide effective calculated-duty rate is 20.77%, so Germany's observed rate is 6.5 points more than average. Freight and insurance add 2.87% on top of customs value. Tracked-family figures are a floor on total bilateral trade.

The current reading

  • Import value: $497.6M of fabricated structural steel from Germany in 2025, customs value.
  • Observed effective calculated-duty rate: 27.27%, reported Calculated Duties ÷ covered customs value, 6.5 points above the 20.77% family average.
  • Share of the family: 7%, #5 named source of fabricated structural steel.
  • Reported freight and insurance: 2.87% of customs value, shown alongside the effective calculated-duty rate.
  • History depth: 12 years of annual named-source boards.

Frequently asked questions

  • What tariff does the U.S. charge on fabricated structural steel from Germany? In 2025, the reported effective calculated-duty rate was 27.27% for fabricated structural steel imported from Germany, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
  • How much fabricated structural steel does the U.S. import from Germany? The U.S. imported $497.6M of fabricated structural steel from Germany in 2025, 7% of the tracked fabricated structural steel it imports, ranking Germany the 5th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
  • What does freight add on fabricated structural steel from Germany? Cost, insurance, and freight ran 2.87% of customs value on fabricated structural steel from Germany in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.