Tariff Monitor
U.S. Imports of Technical and refractory ceramics From Germany
In 2025, U.S. importers brought in $114.2M of technical and refractory ceramics from Germany; the reported effective calculated-duty rate was 10.49% for that flow. That makes Germany the 3rd-largest named source of this family, at 8.8% of tracked technical and refractory ceramics imports. The family-wide effective calculated-duty rate is 9.99%, so Germany's observed rate is 0.5 points more than average. Freight and insurance add 3.01% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $114.2M of technical and refractory ceramics from Germany in 2025, customs value.
- Observed effective calculated-duty rate: 10.49%, reported Calculated Duties ÷ covered customs value, 0.5 points above the 9.99% family average.
- Share of the family: 8.8%, #3 named source of technical and refractory ceramics.
- Reported freight and insurance: 3.01% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 12 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on technical and refractory ceramics from Germany? In 2025, the reported effective calculated-duty rate was 10.49% for technical and refractory ceramics imported from Germany, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much technical and refractory ceramics does the U.S. import from Germany? The U.S. imported $114.2M of technical and refractory ceramics from Germany in 2025, 8.8% of the tracked technical and refractory ceramics it imports, ranking Germany the 3rd-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on technical and refractory ceramics from Germany? Cost, insurance, and freight ran 3.01% of customs value on technical and refractory ceramics from Germany in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.