Tariff Monitor
U.S. Imports of Springs, chain, and wire mesh From India
In 2025, U.S. importers brought in $45.4M of springs, chain, and wire mesh from India; the reported effective calculated-duty rate was 30.28% for that flow. That makes India the 8th-largest named source of this family, at 2% of tracked springs, chain, and wire mesh imports. The family-wide effective calculated-duty rate is 30.76%, so India's observed rate is 0.5 points less than average. Freight and insurance add 7.03% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $45.4M of springs, chain, and wire mesh from India in 2025, customs value.
- Observed effective calculated-duty rate: 30.28%, reported Calculated Duties ÷ covered customs value, 0.5 points below the 30.76% family average.
- Share of the family: 2%, #8 named source of springs, chain, and wire mesh.
- Reported freight and insurance: 7.03% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 7 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on springs, chain, and wire mesh from India? In 2025, the reported effective calculated-duty rate was 30.28% for springs, chain, and wire mesh imported from India, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much springs, chain, and wire mesh does the U.S. import from India? The U.S. imported $45.4M of springs, chain, and wire mesh from India in 2025, 2% of the tracked springs, chain, and wire mesh it imports, ranking India the 8th-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on springs, chain, and wire mesh from India? Cost, insurance, and freight ran 7.03% of customs value on springs, chain, and wire mesh from India in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.