Tariff Monitor
U.S. Imports of Metal-forming machine tools From Italy
In 2025, U.S. importers brought in $311.3M of metal-forming machine tools from Italy; the reported effective calculated-duty rate was 10.84% for that flow. That makes Italy the 2nd-largest named source of this family, at 17.8% of tracked metal-forming machine tools imports. The family-wide effective calculated-duty rate is 10.7%, so Italy's observed rate is 0.1 points more than average. Freight and insurance add 2.39% on top of customs value. Tracked-family figures are a floor on total bilateral trade.
The current reading
- Import value: $311.3M of metal-forming machine tools from Italy in 2025, customs value.
- Observed effective calculated-duty rate: 10.84%, reported Calculated Duties ÷ covered customs value, 0.1 points above the 10.7% family average.
- Share of the family: 17.8%, #2 named source of metal-forming machine tools.
- Reported freight and insurance: 2.39% of customs value, shown alongside the effective calculated-duty rate.
- History depth: 3 years of annual named-source boards.
Frequently asked questions
- What tariff does the U.S. charge on metal-forming machine tools from Italy? In 2025, the reported effective calculated-duty rate was 10.84% for metal-forming machine tools imported from Italy, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
- How much metal-forming machine tools does the U.S. import from Italy? The U.S. imported $311.3M of metal-forming machine tools from Italy in 2025, 17.8% of the tracked metal-forming machine tools it imports, ranking Italy the 2nd-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
- What does freight add on metal-forming machine tools from Italy? Cost, insurance, and freight ran 2.39% of customs value on metal-forming machine tools from Italy in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.