Tariff Monitor

U.S. Imports of Lifting and handling equipment From Japan

In 2025, U.S. importers brought in $1.9B of lifting and handling equipment from Japan; the reported effective calculated-duty rate was 14.24% for that flow. That makes Japan the 2nd-largest named source of this family, at 13.9% of tracked lifting and handling equipment imports. The family-wide effective calculated-duty rate is 11.37%, so Japan's observed rate is 2.9 points more than average. Freight and insurance add 2.08% on top of customs value. Tracked-family figures are a floor on total bilateral trade.

The current reading

  • Import value: $1.9B of lifting and handling equipment from Japan in 2025, customs value.
  • Observed effective calculated-duty rate: 14.24%, reported Calculated Duties ÷ covered customs value, 2.9 points above the 11.37% family average.
  • Share of the family: 13.9%, #2 named source of lifting and handling equipment.
  • Reported freight and insurance: 2.08% of customs value, shown alongside the effective calculated-duty rate.
  • History depth: 3 years of annual named-source boards.

Frequently asked questions

  • What tariff does the U.S. charge on lifting and handling equipment from Japan? In 2025, the reported effective calculated-duty rate was 14.24% for lifting and handling equipment imported from Japan, calculated as reported Calculated Duties divided by covered customs value. It reflects the observed entry mix but does not identify the legal cause of the rate or determine an entry-specific duty.
  • How much lifting and handling equipment does the U.S. import from Japan? The U.S. imported $1.9B of lifting and handling equipment from Japan in 2025, 13.9% of the tracked lifting and handling equipment it imports, ranking Japan the 2nd-largest named source. The chart above traces the retained reported years; a year with no retained source row is unknown, not zero.
  • What does freight add on lifting and handling equipment from Japan? Cost, insurance, and freight ran 2.08% of customs value on lifting and handling equipment from Japan in 2025. That is an additional import burden alongside the reported effective calculated-duty rate; a country-specific invoice price is still required for a comparable landed unit cost.

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-01.